Calibration method for lifting of movable examination well shutter
A calibration method and inspection well technology, which can be used in water conservancy projects, artificial islands, underwater structures, etc., can solve problems such as high cost, difficult maintenance of inspection wells, troublesome construction, etc., and achieve high efficiency, reduce labor intensity, and maintenance costs low effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0020] The movable inspection manhole cover 3 and its well seat 2 form a manhole cover combination, and an isolation ring 4 is added around the manhole cover combination, and its inner ring accommodates the manhole cover combination; the isolation ring 4 isolates the manhole cover combination from the ground material 6 of the road; the isolation ring 4 rows of steel bars 9 reserved on the periphery are embedded in the ground forming material 6, and are integrated with the ground, such as figure 1 As shown; when the well cover assembly is placed into the isolation ring 4, a gasket 5 is reserved between the well cover assembly and the isolation ring 4, with a total thickness of 40mm; a cushion layer 10 is set on the lower edge of the isolation ring 4 and the well cover combination, and a gasket 5 is reserved between the well cover assembly and the isolation ring 4. For the gap 7 with a slope of 30°, when it is necessary to repair and correct the inspection well, use a crowbar to ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Length | aaaaa | aaaaa |
| Total thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 