System and method for preparing rubber-modified asphalt
A rubber modification and production system technology, applied in building components, building insulation materials, construction, etc., can solve the problems of high temperature of base asphalt, long mixing time, low production efficiency, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] (1) Heat the base asphalt in the base asphalt tank from normal temperature to 130°C to make it flow, then pump it into the primary heating tank, raise the temperature (primary heating) to 165°C in 30 minutes, and then pump it into the secondary heating tank, 15 minutes (secondary temperature rise) to 200 ° C, and finally pumped into the mixing swelling tank;
[0040] (2) Put the inner tire rubber powder with a fineness of 30 mesh to 60 mesh into the mixing and swelling tank, wherein the rubber powder input amount is 25% of the pumped amount of matrix asphalt;
[0041] (3) In the mixing and swelling tank, mix the matrix asphalt and rubber powder at 200°C for 5 minutes, then pass through the rubber mill and then pass it into the development storage tank. After mixing for 1 hour at 200°C, the modified rubber is obtained. asphalt.
Embodiment 2
[0043] (1) Heat the base asphalt in the base asphalt tank from normal temperature to 110°C, then pump it into the primary heating tank, raise the temperature (primary heating) to 135°C in 20 minutes, then pump it into the secondary heating tank, 15 minutes (secondary heating) ) to 170°C, and finally pumped into the mixing swelling tank;
[0044] (2) Putting the outer tire rubber powder with a fineness of 30 mesh to 60 mesh into the mixing and swelling tank, wherein the rubber powder input amount is 25% of the base asphalt amount;
[0045] (3) In the mixing and swelling tank, mix the matrix asphalt and rubber powder at 170°C for 10 minutes, then pass through the rubber mill and then pass it into the development storage tank. After 3 hours of stirring and mixing at 170°C, the modified rubber is obtained. asphalt.
Embodiment 3
[0047](1) Heat the base asphalt in the base asphalt tank from normal temperature to 120°C, then pump it into the primary heating tank, raise the temperature to 150°C in 25 minutes (primary heating), then pump it into the secondary heating tank, 13 minutes (secondary heating) ) to 185°C, and finally pumped into the mixing swelling tank;
[0048] (2) Putting the outer tire rubber powder with a fineness of 30 mesh to 60 mesh and the inner tire rubber powder in a mass ratio of 1:1 into the mixing and swelling tank, wherein the rubber powder input amount is 20% of the pumped amount of matrix asphalt;
[0049] (3) In the mixing and swelling tank, mix the base asphalt and rubber powder at 185°C for 7 minutes, then pass through the rubber mill and then pass it into the development storage tank, and mix it at 185°C for 2 hours to obtain the modified rubber asphalt.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com