Method for depleting refining slag of copper
A technology of copper refining and slag, which is applied in the field of copper refining slag depletion, can solve the problems of large proportion and waste of copper resources, and achieve the effect of simple production process operation and favorable recycling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0027] Put 51,710kg of waste purple copper, 14,145kg of residual plate, 21,950kg of black copper block, a total of 87,805kg of raw materials into the melting furnace for melting. After all the furnace materials are melted, the oxidation operation is carried out: the furnace temperature is kept at 1250-1300°C, Insert the iron pipe coated with refractory mud at the pipe head into the copper liquid, blow in the air, the air pressure is 0.5-0.7Mpa, carry out the oxidation operation, gradually adjust the air volume according to the situation in the furnace, and take samples frequently for observation. When the section of the sample is observed to be brick red, add 1200kg of quartz sand to make slag. After 25 minutes, add 150 kg of carbonaceous reducing agent to cover the slag, then insert the iron pipe coated with refractory mud into the copper liquid, and blow in air at a pressure of 0.5-0.7Mpa. After stirring for 5 minutes , Remove the slag.
[0028] After analyzing the slag, th...
Embodiment 2
[0030] Add 54,770 kg of waste copper, 10,085 kg of residual plate, 22,050 kg of black copper block, and a total of 86,905 kg of raw materials into the melting furnace for melting. After all the furnace materials are melted, the oxidation operation is carried out: the furnace temperature is maintained at 1250-1300 ° C, Insert the iron pipe coated with refractory mud at the pipe head into the copper liquid, blow in the air, the air pressure is 0.5-0.7Mpa, carry out the oxidation operation, gradually adjust the air volume according to the situation in the furnace, and take samples frequently for observation. When the section of the sample is observed to be brick red, add 1000kg of quartz sand to make slag. After 25 minutes, add 120 kg of carbonaceous reducing agent to cover the slag, then insert the iron pipe coated with refractory mud into the copper liquid, and blow in air at a pressure of 0.5-0.7Mpa. After stirring for 10 minutes , Remove the slag.
[0031] After analyzing th...
Embodiment 3
[0033] Put 53070kg of waste purple copper, 15495kg of scrap plate, 18360kg of black copper block, a total of 86925kg of raw materials into the melting furnace for melting, after all the furnace materials are melted, carry out oxidation operation: keep the furnace temperature at 1250-1300℃, Insert the iron pipe coated with refractory mud at the pipe head into the copper liquid, blow in the air, the air pressure is 0.5-0.7Mpa, carry out the oxidation operation, gradually adjust the air volume according to the situation in the furnace, and take samples frequently for observation. When the section of the sample is observed to be brick red, add 1050kg of quartz sand to make slag. After 20 minutes, add 130kg of carbonaceous reducing agent to cover the slag, then insert the iron pipe coated with refractory mud into the copper liquid, and blow in air at a pressure of 0.5-0.7Mpa. After stirring for 10 minutes , Remove the slag.
[0034] After analyzing the slag, the copper content in ...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com