Unlock instant, AI-driven research and patent intelligence for your innovation.

Smoke elimination and dust settlement construction method for long and large tunnel and dust settlement station used in construction method

A technology for long tunnels and construction methods, which is applied in mine/tunnel ventilation, dust prevention, earthwork drilling and mining, etc. It can solve the problems of high economic cost and difficult ventilation of long tunnels, and achieve economical rationality, low investment, Effective effect

Inactive Publication Date: 2011-11-09
CHINA RAILWAY NO 5 ENG GRP
View PDF5 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The technical problem to be solved by the present invention is to provide a long tunnel smoke elimination and dust reduction construction method and the dust suppression station used therein, so as to improve the construction operation environment and overcome the difficulty of ventilation and high economic cost of long tunnels in the prior art. insufficient

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Smoke elimination and dust settlement construction method for long and large tunnel and dust settlement station used in construction method
  • Smoke elimination and dust settlement construction method for long and large tunnel and dust settlement station used in construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Embodiments of the invention: The smoke and dust reduction construction method for a long tunnel of the present invention, the smoke and dust reduction operation includes the following steps: moving back the excavation trolley → opening the dust suppression station at the front end of the excavation trolley → blasting → ventilating → opening the dust suppression station at the tunnel forming section → inspecting the hole Internal smoke and dust reduction effect → close the dust suppression station → flush the road surface in the tunnel, it consists of eight parts, and the total operation time of one cycle is 1 to 1.5 hours.

[0026] The long tunnel smoke elimination and dust reduction system is composed of ventilator, air duct, dust suppression station, car washing tank, road cleaning and so on.

[0027] ⑴ Dust suppression station

[0028] Nozzle 7 is arranged on the pipe frame 1, and the nozzle 7 is made of galvanized steel pipe, and the spray hole 6 with a diameter ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a smoke elimination and dust settlement construction method for a long and large tunnel and a dust settlement station used in the construction method. The smoke elimination and dust settlement construction method comprises the following steps of: moving an excavation trolley away; starting the dust settlement station at the front end of the excavation trolley; blasting; ventilating; starting the dust settlement station in a hole formation section; inspecting smoke elimination and dust settlement effects in a hole; stopping the dust settlement station; and flushing a road surface in the hole of the tunnel. In the dust settlement station, spray pipes (7) are arranged on pipe supports (1); mist exhaust holes (6) are formed in the spray pipes (7); the spray pipes (7) are connected with high-pressure air pipes (2) and high-pressure water pipes (3); gate valves (4) are arranged on the high-pressure air pipes (2) and the high-pressure water pipe (3); and drain plugs (5) are arranged on the spray pipes (7). The method and the station have the obvious effects of improving dust settlement efficiency, improving a construction environment in the hole, saving construction cycle time, saving engineering construction cost and the like; and a smoke elimination and dust settlement system is easy to manufacture, is convenient to operate, has obvious integral advantages and solves the technical problems of smoke elimination and dust settlement of the long and large tunnel.

Description

technical field [0001] The invention relates to a construction method for eliminating smoke and reducing dust in a long tunnel and a used dust reducing station. Background technique [0002] In the process of tunnel construction, a large amount of harmful gas and dust produced by blasting excavation, ballasting transportation, sprayed concrete support, etc. not only directly endanger the physical and mental health of construction workers, but also affect labor efficiency and restrict construction progress. Therefore, solving the smoke and dust hazards in tunnels has become an important issue that cannot be ignored in tunnel construction. Timely, efficient, and economical removal of harmful gases and dust in the cave not only reflects the humanistic work concept of green environmental protection, but also effectively improves work efficiency and speeds up the construction progress. [0003] In traditional construction methods, the basic measures for smoke and dust reduction ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21F5/00E21F5/20E21F5/04E21F1/00E21C35/22
Inventor 王祥熊胜何晓春
Owner CHINA RAILWAY NO 5 ENG GRP