Steelmaking and slagging method
A slagging and steelmaking furnace technology, applied in the field of metallurgy, can solve problems such as difficulty in slag formation, achieve the effects of avoiding equipment corrosion and environmental pollution, reducing site area, and reducing production costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0033] This example is used to illustrate the steelmaking slagging method provided by the present invention.
[0034] Steel of U75 grade is smelted on a new 120-ton converter. Add 130.6 tons of vanadium-extracted semi-steel and 7 tons of steel scrap into the converter, and the furnace temperature of the vanadium-extracted semi-steel is 1320°C. Add 1250 kg of lime, 1250 kg of high magnesium lime, 500 kg of flux, 1700 kg of acid composite slag and 800 kg of graphite-like 1 minute after the start of blowing, and form primary slag and primary slag alkali 4 minutes and 30 seconds after blowing starts. The degree is 3.6. 7 minutes after the start of blowing, add 625 kg of lime and 625 kg of high-magnesia lime; 9 minutes after the start of blowing, add 625 kg of lime and 625 kg of high-magnesia lime, and continue blowing for 12 minutes , to obtain molten steel and final slag, the tapping temperature of molten steel is 1685 ℃, the tapping weight of molten steel is 130.72 tons, the b...
Embodiment 2
[0036] This example is used to illustrate the steelmaking slagging method provided by the present invention.
[0037] Steel of U71 steel grade is smelted on a new 120-ton converter. Add 140 tons of vanadium-extracted semi-steel and 5 tons of steel scrap into the converter, and the furnace temperature of the vanadium-extracted semi-steel is 1300°C. Add 1395 kg of lime, 1375 kg of high magnesium lime, 1020 kg of flux, and 1600 kg of acidic composite slag 1 minute after the start of blowing. The primary slag is formed 4 minutes and 33 seconds after the start of blowing, and the basicity of the primary slag is 3.5. 6 minutes after the start of blowing, add 697 kg of lime and 688 kg of high-magnesia lime; 8 minutes after the start of blowing, add 697 kg of lime and 688 kg of high-magnesia lime, and continue blowing for 12.5 minutes , to obtain molten steel and final slag, the tapping temperature of the molten steel is 1682°C, the tapping weight of the molten steel is 136.3 tons, t...
Embodiment 3
[0039] This example is used to illustrate the steelmaking slagging method provided by the present invention.
[0040] The steel of YQ450 steel grade is smelted on a new 120-ton converter. Add 133 tons of vanadium-extracted semi-steel and 4 tons of steel scrap into the converter, and the furnace temperature of the vanadium-extracted semi-steel is 1360°C. Add 1300 kg of lime, 1350 kg of high magnesium lime, 1045 kg of flux, and 1500 kg of acidic composite slag within 1 minute after blowing starts. Primary slag is formed 4 minutes and 35 seconds after blowing starts, and the basicity of the primary slag is 3.65. 6.5 minutes after the start of blowing, add 650 kg of lime and 675 kg of high-magnesia lime; 8 minutes after the start of blowing, add 650 kg of lime and 675 kg of high-magnesia lime, and continue blowing until 12.6 minutes , to obtain molten steel and final slag. The tapping temperature of the molten steel is 1690°C, the tapping weight of the molten steel is 134.42 ton...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com