System for deviation rectifying and reinforcing pier
A bridge pier and offset technology, applied in the field of bridge pier offset correction and reinforcement systems, can solve problems such as potential safety hazards, achieve the effects of reducing construction risks, improving bearing capacity, and clear implementation steps
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] like figure 1 and figure 2 As shown, a bridge pier deviation correction and reinforcement system includes a bored pile 3 at a certain distance from the bridge pier 2 and a first steel plate 9 arranged on the top tie beam of the bridge pier. In this embodiment, the drill There are two rows of cast-in-place piles 3, arranged in the direction perpendicular to the crossed road 1, 3.5m outside the existing pier 2, with a pile diameter of 1.2m, a pile spacing of 3m, and a pile length of 30m. Wherein, the top of the pile foundation of the bored pile 3 is provided with a cap 4, and the cap 4 is away from the preset reinforcement on the side of the pier 2, and the preset reinforcement corresponds to the first steel plate 9; the cap 4 A concrete prefabricated block 5 is arranged near the side of the bridge pier 2, a second steel plate 10 is arranged on the other side of the concrete prefabricated block 5, and a hydraulic jack 6 is installed between the second steel plate 10 and...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com