Method for preventing gunning rebound material from agglomeration and rapidly restoring furnace conditions
A technology for rapid recovery and furnace condition, applied in the direction of furnace, blast furnace, blast furnace details, etc., to achieve the effect of rapid recovery of blast furnace production and strong air permeability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0011] Example 1: The effective furnace capacity of the second blast furnace in Shuigang Iron Works is 1200m 3 , 16 tuyere, bell-shaped furnace top. In 2008, due to the impact of the financial crisis, the production was reduced and the furnace was stopped on October 28, 2008. This time the furnace was stopped for a long time, and the damaged parts of the blast furnace wall were repaired during the shutdown. Spraying, after using this special technology in the spraying process, the spraying construction was smooth, and the circular spraying was completed on time and according to the quality. The daily output of the blast furnace reached 2140t, the ore batch was 23.0t / batch, the load was 3.723t / t, and the coke ratio was 463kg / tFe.
Embodiment 2
[0012] Example 2: The effective furnace capacity of the second blast furnace in Shuigang Iron Works is 1200m 3 , 16 tuyere, bell-shaped furnace roof, and the furnace was opened on February 3, 2009. With the improvement of blast furnace strengthening level, the bell was blown out in March, and the blast furnace top pressure was reduced to 0.080MPa. In addition, the blast furnace was sprayed with paint It has reached the one-year life cycle, so on August 25, 2009, the material surface was sprayed and the furnace top clock was replaced. After using this special technology in the spraying process, the spraying construction was smooth, and the circular spraying was completed on time and according to the quality. The effect is ideal. On September 2, the blast furnace was blocked and 10 tuyere air supply was restored. It lasted 54 hours for all tuyere to work. On the 4th, the daily output of the blast furnace reached 2350t, the load was increased to 4.0t / t, and the coke ratio was 380k...