Method for paving water-permeable brick-paved ground and water permeation locator
A laying method and positioner technology, which can be applied to pavement details, roads, road repairs, etc., can solve the problems of complex pavement brick production equipment and paving process, difficulty in meeting the frost resistance of pavement bricks, and inability to play a water-permeable role. Good water permeability, simple construction, convenient processing and use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Example 1, such as figure 1 , figure 2 and Figure 6 as shown in:
[0027] Laying method of the present invention comprises the steps:
[0028] A: First, lay a water storage gravel layer on the road base according to the design requirements. The water storage rate of the gravel layer is 40%, and the gravel layer should be compacted and rolled flat;
[0029] B: Lay a dry hard cement mortar cushion on the water-storage gravel, and then lay ordinary pavement bricks 1 by using ordinary cement mortar to sit and fill the joints; in this embodiment, the most commonly used square pavement is used Pavement bricks, because the brick seam 3 of its laid pavement is in the shape of "well", that is, the joints of its assembled joints are in the shape of "ten".
[0030] C: When the dry and hard cement mortar cushion is not dry, nail the permeable positioner 2 into the node of the brick joint 3; in order to make the laying more efficient, use the steel drill 8 to nail the permeabl...
Embodiment 2
[0033] Example 2, such as image 3 as shown in:
[0034] This embodiment is used in the case where the permeable pavement brick is a rectangular pavement brick. The cross-sectional shape of the permeable locator is a T-shaped permeable locator 5, and its hollow part 51 is also a T-shaped structure; The permeable locator is nailed into the node of the brick joint, and the cross-sectional shape of the drill bit of the steel drill should be the same as the cross-sectional shape of the hole 51 of the permeable locator, so that when the steel drill is used, the drill bit of the steel drill can be inserted into the hollow of the permeable locator , That is, in this embodiment, the cross-sectional shape of the drill bit of the steel drill is also T-shaped.
[0035] Other parts of this embodiment are identical to Embodiment 1.
Embodiment 3
[0036] Example 3, such as Figure 4 Shown:
[0037] This embodiment is used in the occasion where the permeable pavement is paved with regular octagonal pavement bricks and regular quadrilateral pavement bricks. The cross-sectional shape of the permeable positioner is Y-shaped, and the Y-shaped shape is formed by a right angle and two 135° obtuse angles. Y-shaped structure. When a steel drill is used as a nailing tool, the cross-sectional shape and size of the drill bit part are the same as the cross-sectional shape of the hole 61 of the permeable positioner.
[0038] Other parts of this embodiment are identical to Embodiment 1.
PUM