A current loop and loop technology, applied in the phase angle between voltage and current, measuring current/voltage, measuring electricity and other directions, can solve problems such as inability to use, test current loop, lack of generator power in substations, etc., to ensure correct performance, avoid accidental shocks, reduce workload and test time

Inactive Publication Date: 2012-07-11
YUNNAN POWER GRID
View PDF1 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the lack of generator power in the substation, this method cannot be used to test the current loop

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for inspecting current loop of main transformer sleeve by using zero lifting flow
  • Method for inspecting current loop of main transformer sleeve by using zero lifting flow
  • Method for inspecting current loop of main transformer sleeve by using zero lifting flow

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The method for checking the current loop of the main transformer bushing with zero rise current, the present invention is characterized in that: before the 220kV substation is put into production with live electricity, the following steps are carried out: Step 1, according to the order of one-to-one correspondence of cable connections, output the three-phase voltage regulator Use the A-phase circuit, B-phase circuit and C-phase circuit of the test line, which are respectively connected to the primary three-phase A-phase circuit, B-phase circuit and C-phase circuit on the 110kV side of the main transformer; set three-phase grounding on the 220kV side of the main transformer Short circuit point; step 2, close the test air switch, monitor the test current with a clamp meter, and monitor the secondary circuit current with a clamp phase meter; adjust the three-phase voltage regulator to slowly increase the three-phase test current from zero, so that When the secondary current...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for inspecting a current loop of a main transformer sleeve by using zero lifting flow. The method comprises the following steps of: correspondingly connecting an A phase loop, a B phase loop and a C phase loop which are output by a three-phase voltage regulator to an A phase loop, a B phase loop and a C phase loop of a primary three-phase loop on the 110kV side of a main transformer by using a test wire respectively; inspecting a secondary current amplitude value and a phase angle of a sleeve type current transformer on the 110kV side and current of a neutral wire by using voltage UA of a primary A phase loop as a reference vector at an on-site terminal box and a control chamber screen cabinet; and finally, inspecting a secondary current amplitude value and a phase angle of a sleeve on a 220kV side and the current of the neutral wire by using the voltage UA of the primary A phase loop as the reference vector at the on-site terminal box and the control chamber screen cabinet, and analyzing and judging data to judge whether the loops are correct or not. By the method, the polarity, the transformation ratio and the wiring condition of an alternating current loop of the main transformer sleeve can be inspected by the zero lifting flow to find a secondary loop connecting wire which is not connected or is connected by mistake.

Description

technical field [0001] The invention belongs to the field of electrical technology, and is especially used for carrying out a zero-up current test on the main transformer before the substation is put into operation, to detect the AC current amplitude and phase angle of the bushing current loop, to judge whether the loop is correct through the data, and to ensure the wiring of the loop method of correctness. Background technique [0002] Electricity has become an indispensable life necessity for people. Substation is an important part of power transmission. The correctness of the AC current circuit of the main transformer bushing will affect the safety and stability of the power grid, affect the normal supply of power and the normal operation of people. Life. [0003] Before the substation is live and put into production, there are two methods for checking the current loop from zero current up. The first method is to use the lamp transformer to perform a current boost on the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01R31/02G01R19/00G01R25/00
Inventor 陈勇刘柱揆李胜男许守东杨传斌
Owner YUNNAN POWER GRID
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products