A sliding form and single-sided technology, which is applied in the field preparation of formwork/formwork/work frame, building components, construction, etc., can solve the problems of long construction period and high construction cost, so as to reduce construction cost, save materials, and speed up construction. The effect of construction progress

Active Publication Date: 2014-07-09
SINOHYDRO BUREAU 14 CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. Purpose of the invention: to overcome the disadvantages of repeated disassembly and assembly, high construction cost, and long construction period brought about by the existing small formwork method, and provide a large-scale mold with convenient operation, low construction cost and good pouring quality. Construction equipment and method for underground concrete pouring in hydropower projects

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Single-side side wall slip form and construction method
  • Single-side side wall slip form and construction method
  • Single-side side wall slip form and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0009] Designed and manufactured a single-sided side wall slipform suitable for underground concrete pouring of large hydropower projects. The single-sided side wall sliding form is composed of the main body of the sliding form, the guide rail (9), the guide wheel mechanism (6), the hydraulic climbing device and the pipe frame (21). The parts are connected by bolts and form a whole after installation; the main body of the sliding form is composed of Formwork (1), backing (4), lifting frame (5), platform (3), back connection (7); hydraulic climbing device consists of hydraulic jack (20), climbing rod (15), limit leveler (19) The hydraulic pump station is composed; its characteristics are: 1. The template (1) The panel is made of steel plate with a length of 1200mm, a width of 882.3mm, and a thickness of 3mm. The web is welded around, the support panel, and bolt holes are opened on the web. The two are connected by bolts. The 34 templates are connected to form a template set. The...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Single-sided side wall slip form and construction method. The sliding form is composed of formwork, lifting frame, back flute, platform, back connection, guide rail, guide wheel mechanism, hydraulic jack, limit leveler, climbing rod, pipe frame and bolt connection. The face plate of the formwork is welded to the web, the web is opened with bolt holes, and hung on the back corrugation, which is grooved and made of steel, 34 templates are connected into a 30m formwork group, with a slope of 0.3% to 0.5%; the lifting frame is formed by a groove It is made of steel and angle steel connection; the back connection is steel plate; the formwork, platform, back connection and lifting frame are connected as a whole, and connected with the hydraulic jack to drive the sliding form to rise; the diagonal brace is connected to fix the lifting frame and the lower back corrugated; the guide rail is made of channel steel , welded with the rock wall anchor rod; the guide wheel mechanism is composed of a guide wheel, a bracket, and a shaft, which is installed between the back corrugated, and the shaft connects the bracket and the guide rail; the climbing rod is made of steel pipes, and the jack climbs along it; limit leveling The climber adjusts the climbing position; the pipe frame ensures the stability of the climbing pole. The construction method is that the sliding form is poured while climbing, and the concrete is formed at one time.

Description

1. Technical Field [0001] The invention belongs to the technical field of hydropower engineering, and specifically relates to construction equipment and methods for underground concrete pouring of large hydropower projects. 2. Background technology [0002] The concrete pouring of the single-sided side wall of the underground gate pier chamber of the large hydropower project used traditional small formwork to carry out the concrete pouring construction in the past in China. The process is more complicated, a lot of money and manpower are invested, and the construction period is long. Considering the Xiluodu project, the size of a single-sided high side wall is approximately, length: 84m, height: 57m. The size of the traditional small formwork is generally: length: 1.5m, width: 0.3m, generally rectangular. Due to inevitable errors during manufacturing and installation, the quality of the cast is not high. As far as the pouring process is concerned, due to the limitation of the si...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04G11/22E04G11/24E04G21/00
Inventor 邓孝洪高兴月雷兴国李有福王庆来黄岗曾理偰光恒史志峰陈芝焕张玉彬杨立峰张发斌梁志昆陆永昆李毅
Owner SINOHYDRO BUREAU 14 CO LTD