Production process for rubber foam material by means of compression molding
A production process and technology of foaming materials, applied in the field of production process of rubber products, can solve the problems such as the elaboration and quantification of the degree of unpre-crosslinking, and achieve the effects of reducing weight, preventing gas overflow, and improving use efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1-6
[0027] Examples 1-6: Comparison of the effects of different pre-crosslinking degrees on rubber molding foaming.
[0028] The mixing process of the mixed rubber: the preparation and performance test results of the rubber foam materials of Comparative Example 1 and Examples 1-6 are shown in Table 1. According to the ratio of raw materials in Table 1, plasticize NR and SBR in the range of 40-50°C respectively with an open mill, and adjust the roller distance of the open mill to 2-3 mm to make it reach a certain degree of plasticity. Standby; adjust the roller distance of the open mill to 1mm, then knead BR, add SBR in turn after wrapping the rolls, and make triangular bags 3 to 5 times after NR is evenly mixed, add reinforcing agent, oxidation Zinc, zinc stearate, PEG, DEG, coupling agent, naphthenic oil, foaming agent OBSH, anti-aging agent and accelerator. After the rubber is mixed and mixed, the temperature of the mixing roller is controlled at 50 ° C ~ 60 ° C Within the rang...
example 7~8
[0031] Examples 7-8: Comparing the influence of different foaming agents on rubber molding foaming in one-step method and two-step method.
[0032] The preparation and performance test results of the rubber foam materials of Comparative Examples 1-3 and Examples 7-8 are shown in Table 2. According to the ratio of raw materials in Table 2, the mixing process of the rubber compound is the same as in Examples 1-6. Comparative examples 1 to 3 adopt a one-step molding method, and the process conditions are 150°C×T 90 , Embodiment 7~8 adopts quantitative pre-vulcanization molding method, the condition of the first step pre-vulcanization is 120 ℃ × T 30 (the time corresponding to the degree of pre-crosslinking being 30%), the vulcanization condition of the second step molding method is 150 ℃ × (T 90 -T 30 ), to prepare rubber molded foam materials with different foaming agents. It can be seen from Table 2 that compared with the foamed material without pre-crosslinking, the foamin...