Underwater environment-friendly construction technology for large cast-in-situ bored pile
An environmentally friendly technology for bored piles, which can be used in earth-moving drilling, dewatering/drying/concentrating sludge treatment, wellbore/well components, etc. The quality is easy to guarantee, the operation is simple and intuitive, and the effect of solving the high consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] Such as figure 1 As shown, the drilling rig 1 is connected to the underwater construction through the water construction platform 2, and the periphery is protected by a steel barrel 3. The excavated mud is separated by the mud separator 4, and the inferior mud with a diameter greater than 0.074mm is separated. , keep the high-quality mud whose particle diameter is less than 0.074mm, and circulate the high-quality mud for drilling wall protection. The high-quality mud flows back to the construction site through the high-quality mud return pipe 6, and the waste mud is transported to the mud ship 7 through the diversion tank 5, and transported by sea The waste mud is transported to the on-road sludge treatment system 10 for treatment by land transportation, and the treated mud is transported to the spoil yard for later use. The tail water produced during drying is collected by the water collection well 8 and processed through the treatment well 9, and is collected and conc...
Embodiment 2
[0025] Describe the detailed process flow during construction:
[0026] The sludge in the bored pile is separated by the separator and transported to the mud ship by the diversion tank, and then transported to the shore by the mud ship, where it is grabbed by the tower crane on the shore foundation with a grab bucket to the land vehicle, and transported by the vehicle Go to the drying field for harmless treatment. During the treatment process, the leachate formed by the sludge will be collected and concentrated, and then circulated for the preparation of bored pile mud.
[0027] The sludge treatment system is mainly composed of drying field, sand drying field, tail water collection and concentration pool and other parts. The sludge transported to the treatment plant is usually dried naturally for 4 to 5 days in the sludge drying plant, then cleared and transported to the sand drying plant for further dehydration treatment, and when the moisture content drops to about 50%, it i...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information