Device used for collecting biological crust soil layer, and application thereof in the wild
A biological crust and soil technology, applied in the field of soil biological science, can solve problems such as long cycle, achieve the effect of simple and easy method, ensure stability, and avoid bumping or dumping
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] Embodiment 1: Sampling device for collecting biocrust soil grinding slices
[0019] The sampling device used to collect biocrust soil grinding slices is a triangular prism with a height of 5 cm and a side length of 3 cm. Two layers of one side are overlapped and folded in half; by selecting a plastic plate with hardness and elasticity and a thickness of 0.5-1 mm, cut Grow a 9cm by 5cm wide strip of plastic, then fold it into a triangular shape, forming two overlapping folds on one side of the opening.
Embodiment 2
[0020] Embodiment 2: Sample storage device for fixed collection of biocrust soil grinding slice sampling device
[0021] Select a plate with a length of 20 cm, a thickness of 8 cm, and a multiple of 19.5 cm wide as the storage device base of the device for collecting biological crust soil grinding slices, and take out some rectangular grooves in it as sample grooves, and the groove length of each sample groove is 14cm, width 2.5cm, depth higher than 5cm, lower than 8cm, the distance between the sample grooves is 3cm, used to place and fix the device for collecting biological crust soil grinding slices.
Embodiment 3
[0022] Embodiment 3: The application method of the sampling device for collecting biocrust soil grinding slices in the field
[0023] Spray the biocrust soil sample to be collected, and the spraying humidity should be such that the soil sample does not disperse after collection, and then insert the prepared above-mentioned grinding slice sampling device for collecting biocrust soil into the soil layer vertically until Stop when the surface layer of the sample is 2cm away from the top of the sampling device. Gently pinch the top of the sampling device and pull it out. It does not enter the 2cm part of the soil layer. The slight shrinkage of the sampling device will make the soil samples collected in the sampling device completely taken out together with the sampling device; After taking out the samples, seal the bottom of the sampling device with scotch tape to prevent the sand from flowing out; put them into the sample tank of the sample storage device after numbering, and alte...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com