Emulsified bitumen used for plate-type ballastless track CA mortar and preparation method
A technology of slab ballastless track and emulsified asphalt, which is applied to building components, building insulation materials, buildings, etc., can solve the problems of short working time, poor stability, and poor fluidity of CA mortar, and achieves a simple and convenient preparation method , good storage stability and low cost of raw materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0018] Fully dissolve the emulsification stabilizer calcium chloride 0.25% and cationic polyacrylamide 0.05% in water at 90°C, cool to 40°C, and then mix it with the composite bitumen emulsifier octadecyltrimethylammonium chloride 1.5% and wood Add 0.5% Suamine to 15-40°C water to make soap, adjust the pH of the soap to 4 with hydrochloric acid; rinse the colloid mill with excess soap, set the temperature of the colloid mill to 45°C, and the pressure to 0.2MPa Add 55% of Shengli No. 70 bitumen at a temperature of 140°C and 45% of soap liquid at a temperature of 55°C into a colloid mill for full emulsification and dispersion to obtain emulsified asphalt.
Embodiment 2
[0020] Fully dissolve the emulsification stabilizer ammonium chloride 0.3% and polyethylene glycol 0.1% in water at 90°C, cool to 40°C, then mix it with the compound bitumen emulsifier octadecyltrimethylammonium chloride 1.0%, tallow Add 0.5% of amidopolyamine and 1.0% of stearic acid amidopolyamine to water at 15-40°C to make soap, adjust the pH of the soap to 4 with hydrochloric acid; rinse the colloid mill with excess soap, and lower the temperature of the colloid mill Set at 50°C and pressure at 0.1MPa, add 60% of Maoming No. 90 bitumen at a temperature of 145°C and 40% of soap liquid at a temperature of 55°C into a colloid mill for full emulsification and dispersion to obtain emulsified asphalt.
Embodiment 3
[0022] Fully dissolve the emulsification stabilizer ferric chloride 0.4% and hydroxypropyl cellulose 0.1% in water at 90°C, cool to 40°C, and then mix it with the compound asphalt emulsifier alkyl dimethyl hydroxyethyl ammonium chloride 3.5% Add 1.0% of alkyl bisquaternary ammonium salt to 15-40°C water to make soap, rinse the colloid mill with excess soap, set the temperature of the colloid mill at 55°C, the pressure at 0.2MPa, and the temperature at 150 Add 65% of Jinan No. 100 bitumen at ℃ and 35% of soap solution at 45 ℃ to the colloid mill and fully emulsify and disperse to obtain emulsified asphalt.
PUM