Draining inspection shaft capable of controlling lifting, and manufacture method of draining inspection shaft
A manufacturing method and inspection well technology, which are applied to drainage structures, waterway systems, water supply devices, etc., can solve problems such as affecting driving safety, large damage to vehicles and tires, and large on-site workload, so as to improve the effect of controlling settlement, increase The effect of better load-bearing capacity and waterproof performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] like figure 1 and figure 2 As shown, it is a subsidence-controllable drainage inspection well provided by Embodiment 1 of the present invention, which includes a wellbore 1 and a subsidence-controlling base 2 . The width of the subsidence control base 2 is greater than the width of the shaft 1 . The control settlement base includes an embedded part 3 , a body part 4 and a control settlement part 5 . The embedded part 3 is embedded into the bottom of the inner cavity of the well shaft 1 . The body part 4 is located below the embedding part 3 and connected with the embedding part 3 . The control subsidence part 5 extends outward from the outer wall of the main body part 4 , and the top surface of the control subsidence part 5 is flush with the bottom surface of the shaft 1 . A plurality of grouting holes 6 are opened on the wall of the shaft 1 . The shaft 1 and the subsidence control base 2 are made of reinforced concrete. In this embodiment, the shaft 1 is cylindr...
Embodiment 2
[0052] like image 3 As shown, it is the subsidence-controllable drainage inspection well provided by the second embodiment of the present invention, which is roughly the same as the subsidence-controllable drainage inspection well in the first embodiment, except that the subsidence-controlling part 7 is in the shape of a cylinder. In this embodiment, the outer diameter of the controlled subsidence part 7 is 30cm-200cm wider than the outer diameter of the wellbore.
Embodiment 3
[0054] like Figure 4 As shown, it is the drainage inspection well with controllable settlement provided in Embodiment 3 of the present invention, which is roughly the same as the drainage inspection well with controllable settlement in Embodiment 1, except that the control settlement part includes a plurality of control settlement blocks 8 . In this embodiment, the number of control settling blocks 8 is four. It can be understood that the number of control settling blocks 8 is not limited to four in this embodiment, and is preferably an even number. Four control settling blocks 8 are symmetrically distributed around the outer wall of the main body at equal intervals, and the four control settling blocks 8 are located on the same plane. In this embodiment, the longitudinal section of each control settling block 8 is trapezoidal. It can be understood that the longitudinal section of each control settling block 8 can also be rectangular or other shapes. In this embodiment, the...