Full bainitic steel frog and manufacturing method thereof
A technology of bainite steel and frogs, which is applied in the field of railway frogs and its manufacturing, to achieve the effect of reducing manufacturing costs and improving weldability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0020] A full bainitic steel frog, the frog core rail has chemical composition (wt%): 0.34 C, 1.58 Mn, 1.45 Cr, 1.24 Si, 0.59 Al, 0.72 Ni, 0.38 Mo, 0.0014 O, 0.00009 H, 0.008 Ti, 0.0004 B, 0.022 V, 0.005 Nb, 0.005 S and 0.008 P, and the rest is Fe, which is cast and rolled into a square billet with a rectangular section of 180mm×90mm, and the rolling ratio is 7. The bainite steel core rail of this composition is flash-welded with the ordinary U75V steel 60 rail. The specific process parameters for flash welding are: flash speed 3mm / s, upsetting speed 80mm / s, upsetting pressure 40MPa, and material The protruding lengths are equal. After the flash welding of the bainitic steel frog core rail, heat treatment is carried out as a whole. The heat treatment process is as follows: firstly, the whole welded bainitic steel frog core rail is heated to 910°C and kept for 160 minutes for austenitization treatment, and then quenched into 550°C successively. and 310°C salt bath for graded i...
Embodiment 2
[0022]Another full bainitic steel frog, the chemical composition of frog core rail is (wt%): 0.35C, 1.61 Mn, 1.52 Cr, 1.31 Si, 0.67 Al, 0.58 Ni, 0.35 Mo, 0.0015 O, 0.00008 H, 0.008 Ti, 0.0004 B, 0.002 V, 0.001 Nb, 0.009 S and 0.009 P, and the rest is Fe, which is cast and rolled into a billet with a section of 180mm×90mm, and the rolling ratio is 8. The bainitic steel core rail with this composition is flash-welded with the ordinary U75V steel 60 rail. The specific process parameters during flash welding are: flash speed 2.2mm / s, upsetting speed 95mm / s, upsetting pressure 48MPa, and the welding material The protruding lengths are equal. After the flash welding of the bainite steel frog core rail, heat treatment is carried out as a whole. The heat treatment process is as follows: firstly, the whole welded core rail is heated to 940°C and kept for 110 minutes for austenitization treatment, and then quenched into salt baths at 550°C and 330°C successively. Carry out graded isoth...
PUM
| Property | Measurement | Unit |
|---|---|---|
| yield strength | aaaaa | aaaaa |
| yield strength | aaaaa | aaaaa |
| hardness | aaaaa | aaaaa |