Fast in-place paving construction method for thick and heavy stone blocks

A construction method and stone technology, which are applied in the directions of paving, roads, and road repairs paved with prefabricated blocks, can solve the problems of difficulty in ensuring ground flatness, difficulty in prying out, and inability to accurately and quickly realize stone placement. , to achieve the effect of low cost, convenient manufacture and simple structure

Active Publication Date: 2013-04-10
GUANGZHOU NO 1 CONSTR ENG +2
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, when paving stones in the prior art, plane positioning, elevation control and mortar thickness are all realized by repeated operations (for example: if the elevation or position or flatness does not meet the requirements, it is necessary to pry out the stones, add or Reduce the thickness of the mortar and adjust it before placing it again. If you can’t do it once, you have to adjust it several times. For thick stones, it’s very difficult to pry out), the stones cannot be placed in place accurately and quickly, and the ground where the stones are laid It is also difficult to guarantee the flatness of

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fast in-place paving construction method for thick and heavy stone blocks
  • Fast in-place paving construction method for thick and heavy stone blocks
  • Fast in-place paving construction method for thick and heavy stone blocks

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Combine below figure 1 , figure 2 , image 3 An embodiment of the present invention is described in detail.

[0026] figure 1 Shown is a schematic cross-sectional view of the ground treatment and paving project. According to the bottom-up order, pour reinforced concrete structure surface 1 first, and then construct waterproof mortar leveling layer 2, polymer coil waterproof layer 3, extruded polystyrene insulation layer 4, and fine stone waterproof concrete layer 5 in sequence , Set up the layer of the quick positioning device 6, dry hard cement slurry 7, stone slab 8.

[0027] specifically, figure 1 The construction method for fast placement and paving of heavy stones in the ground treatment and paving project includes the following steps:

[0028] (1) Manufacture the quick positioning device 60. The quick positioning device 60 includes a transverse force receiving part and a longitudinal force receiving part perpendicular to each other; the transverse force receiving...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a fast in-place paving construction method for thick and heavy stone blocks. The fast in-place paving construction method comprises the following steps of: (1) manufacturing a fast in-place device, wherein the fast in-place device comprises a transverse stress part and a longitudinal stress part which are vertical to each other, the transverse stress part is of a plane framework and is used for directly supporting single stone blocks, and the longitudinal stress part is fixedly connected with one side of the plane framework and used for supporting the transverse stress part and the stone blocks thereon; (2) pre-burying a connecting steel bar which is vertically upward in the paving position of each stone block; (3) testing repeatedly to measure the virtual paving height M of mortar for paving the stone blocks, which is further used for paving the stone blocks with the same thickness and size; (4) fixedly connecting the vertical stress part of the fast in-place device with the connecting steel bars to fixedly mount the fast in-place device, and performing the paving control on the stone blocks in a wire hanging mode; (5) enabling the paid mortar to achieve the virtual paving height M; and (6) paving the stone blocks on the transverse stress part of the fast in-place device, and thrashing the stone blocks to compress the mortar which is virtually paved.

Description

Technical field [0001] The invention belongs to the field of civil construction engineering, and in particular relates to a construction method for paving thick and heavy stones quickly in place. Background technique [0002] With the improvement of living standards, more and more activity squares appear and the demand is still increasing. Large squares generally use large-thick stones for floor paving. Stones such as granite are durable, strong and reliable. They are commonly used in square floor paving construction, and these large-thick stones are single The block is heavy and difficult to transport. [0003] When paving, factors such as the plane positioning of the stones, the elevation control, and the thickness of the mortar determine the quality, progress and perception of the paving of the square stones. However, when paving stones in the prior art, plane positioning, elevation control, and mortar thickness are all realized by repeated operations (for example, if the elev...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01C5/02E01C19/52
Inventor 关而道邵泉胡志桥吴瑞卿钟文深李麟吴昊
Owner GUANGZHOU NO 1 CONSTR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products