Formation testing process technology in exploration of oil and gas field
A technology of formation testing and process technology, which is applied in wellbore/well components, earthwork drilling and other directions, and can solve problems such as tool opening and incomplete well shut-in.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] Through the test of many high-temperature and high-pressure deep wells containing H2S and CO2 corrosion in China, the actual construction often adopts the method of opening and closing the formation test well, and the shut-in time is generally 4-12 hours, and the well-opening time is 4-8 hours. The main limiting factors are: first, the downhole testing tool is subjected to complex forces and loads, and it is difficult to accurately open and shut down the well; the second is to directly and alternately change the working state of the downhole tool, which is not good for the protection of the tool seal. In the middle of the open hole test, due to the high risk of the test and the short test time (6-8 hours), generally only one well opening and one well closing are performed. Once the well is opened to obtain the productivity fluidity, once the well is shut down to obtain the formation pressure and parameters. When setting and testing the open hole section in the casing, t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 