Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Control and charge calculation method for power grid power load peak shift in short supply situation

A technology that is in short supply and power load, applied in computing, data processing applications, instruments, etc., can solve the problems of deviation of power user's peak-shifting quotation, inability to solve the deviation between power user's peak-shifting quotation and real peak-shifting cost, and grid companies' inability to know, etc. , to achieve the effect of improving uniformity, avoiding oscillation phenomenon, and strong operability

Inactive Publication Date: 2013-09-25
TSINGHUA UNIV
View PDF0 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In this method, the power user’s peak shifting cost is borne by the power grid company, and the power user will tend to quote a high price, which will cause the power user’s peak shifting quotation to deviate from its real peak shifting cost; while the power user’s real peak shifting cost is the power user’s The private information of the grid company cannot be obtained
In the case of information asymmetry between the power grid company and the power user, this method cannot solve the problem of the deviation between the peak shifting quotation of the power user and the real peak shifting cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Control and charge calculation method for power grid power load peak shift in short supply situation
  • Control and charge calculation method for power grid power load peak shift in short supply situation
  • Control and charge calculation method for power grid power load peak shift in short supply situation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0090] Taking the IEEE-3 node power grid as an example, it is assumed that the power grid contains 210 power users, and the duration of each power consumption curve is 8 hours. The principle between 12:00 is randomly generated; during the peak load period, the movable peak load is 13.86MW, and the non-movable peak load is 269.61MW. The movable peak load accounts for 4.89% of the total load of the grid. For some reason, the power grid is in short supply during peak load hours (17:00), and the power deficit is 1.386MW. The control cycle T is 24 hours the next day, separated by 1 hour, and the control cycle is divided into 24 control periods.

[0091] The invention provides a control method for power load peak shifting under the condition that the power grid is in short supply, such as figure 2 Shown, the specific embodiment of the present invention comprises the following steps:

[0092] S1. Power users submit the data of power consumption curve and peak shifting quotation cu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a control and charge calculation method for power grid power load peak shift in a short supply situation, and belongs to the technical field of power grid power control. The control and charge calculation method for the power grid power load peak shift in the short supply situation comprises the steps that power consumers submit data of power consuming curves and data of peak shift quotation curves to a power grid company; the power grid company builds a power load peak shift optimizing model according to the data, submitted by the power consumers, of the power consuming curves and the data, submitted by the power consumers, of the peak shift quotation curves; the power load peak shift optimizing model is solved to obtain an optimum control plan of the power consumer peak shift, and peak shift control signals are sent to all the power consumers; the power consumers carry out load peak shift according to the peak shift control signals sent by the power grid company; after power load peak shift is completed, charges of the power consumers involved in the peak shift are shared by power consumers not involved in the peak shift. The control and charge calculation method for the power grid power load peak shift in the short supply situation can improve evenness of the spatial and temporal distribution of power load, and thus power resources are made to be utilized more sufficiently. Precision control of the power grid company over the power consumer peak shift according to needs can be achieved, and the control and charge calculation method for the power grid power load peak shift in the short supply situation has important practical significance and good application prospects.

Description

technical field [0001] The invention belongs to the technical field of grid electric power control, and in particular relates to a control and cost calculation method for power load peak shifting under the condition that the grid is in short supply. Background technique [0002] Demand side management (DSM) refers to the planning and measures formulated by power companies to influence the power consumption mode of power users and improve the uniformity of power load distribution in time and space. In the 1970s, in order to deal with the energy crisis, the United States began to adopt management measures to curb energy consumption. In the 1980s, it gradually evolved into a load control method of shaving peaks and filling valleys. By 1984, the American Electric Power Research Institute (EPRI) clearly proposed the concept of demand side management for the first time (Clark W G. Then and now: The perspective of the man who coined the term 'DSM' [J]. Energy Policy, 1996, 24 (4),...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCY02E40/70Y04S10/50
Inventor 钟海旺夏清康重庆
Owner TSINGHUA UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products