Large-size steel pipe column concrete construction device and construction method
A construction device and steel pipe column technology, which is applied in the field of large-scale steel pipe column pouring, lifting concrete construction equipment, and vibration fields, can solve the problems of structural cavity, no slurry, and quality cannot be guaranteed, so as to ensure construction quality, improve engineering efficiency, Make simple effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] The present invention will be further described below in conjunction with the accompanying drawings.
[0013] In the figure, the large-scale steel pipe column concrete construction device of the present invention is mainly composed of scaffolding 1, steel pipe column 2, vibrating pump head 3, pouring nozzle 4, floating platen 5, floating platen edge protection 6, lifting lug 7, hose 8. Vibrating pump rod 9, traction rope 10, plug-in vibrating pump 11, slurry outlet 12 of pump truck, concrete pump truck 13, and feed connecting pipe 14.
[0014] as the picture shows:
[0015] Scaffold 1 adopts a common steel pipe scaffold with a diameter of 48 mm and a wall thickness of 3.0 mm, and is erected around the required steel pipe column 2 according to the design.
[0016] The steel pipe column 2, the steel pipe column 2 is used as the outer wall of concrete pouring.
[0017] The vibrating pump head 3, as the vibrating part at the top of the plug-in vibrating pump 11, is connec...