Segmental assembly method of whole hole box girder applied to bridge construction
A technology for bridge construction and box girders, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as difficult assembly and construction, and achieve the effects of shortening the construction period, convenient operation, high practicality and promotion value
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0028] The segmental assembly method of the whole hole box girder provided by this technology is based on the self-designed segmental prefabrication method of the whole hole box girder, which belongs to its follow-up technology. This technology has applied for a patent, and the specific content has been published in the patent. Only a brief description is given here.
[0029] The segmental prefabrication method of the whole hole box girder, the main process is as follows: (1) Set up a prefabrication field in an open environment and build a greenhouse; (2) Set up a pedestal for prefabricating the whole hole box girder segment in the greenhouse ; (3) Segment according to the erection position of the whole-hole box girder, and use steel on the pedestal to build a prefabricated formwork corresponding to the whole-hole box girder section; (4) Use the short-line method to prefabricate the whole Each segment of the perforated box girder. This method mainly solves the problem of pref...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com