Filling wall and construction method of flexible yield protection roadway without coal pillar filling mining
A technology of filling walls without coal pillars, applied in fillings, mining equipment, earthwork drilling, etc., can solve the problems of poor pressure relief, difficult construction, complex structure, etc., and achieves slow resistance increase speed, simple construction, The effect of reducing labor intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Step 1: Calculate the height h of the expansive organic foam filling wall 1 Height h of similar paste filling body 2 :
[0038] h 1 = l L · h
[0039] h 2 =h-h 1
[0040] Where: h 1 - The height of the organic foam filling wall, in m;
[0041] h 2 - the height of the wall filled with paste, in m;
[0042] l- width of lane retention, unit m;
[0043] L - the span of the old top rock beam, in m;
[0044] h-mining height, unit m.
[0045]Step 2: After the coal mining face is mined, retain the roadway according to the existing roadway filling method, and use double-row metal hinged roof beams (1) and single hydraulic props (5) to strengthen the roof support beside the roadway, and the inner side of the single hydraulic prop Install the filling template (4), and install the cord (2) inside the template;
[0046] Step 3: Fill the inner side of the curtain ...
Embodiment 2
[0050] Step 1: Calculate the height h of the expansive organic foam filling wall 1 Height h of wall filled with paste 2 :
[0051] h 1 = l L · h
[0052] h 2 =h-h 1
[0053] Where: h 1 - The height of the organic foam filling wall, in m;
[0054] h 2 - the height of the wall filled with paste, in m;
[0055] l- width of lane retention, unit m;
[0056] L - the span of the old top rock beam, in m;
[0057] h-mining height, unit m.
[0058] Step 2: After the coal mining face is mined, retain the roadway according to the existing roadway filling method, and use double-row metal hinged roof beams (1) and single hydraulic props (5) to strengthen the roof support beside the roadway, and the inner side of the single hydraulic prop Install the filling template (4), and install the cord (2) inside the template;
[0059] Step 3: Fill the inner side of the curtain wit...
Embodiment 3
[0063] Step 1: Calculate the height h of the expansive organic foam filling wall 1 Height h of wall filled with paste 2 :
[0064] h 1 = l L · h
[0065] h 2 =h-h 1
[0066] Where: h 1 - The height of the organic foam filling wall, in m;
[0067] h 2 - the height of the wall filled with paste, in m;
[0068] l- width of lane retention, unit m;
[0069] L - the span of the old top rock beam, in m;
[0070] h-mining height, unit m.
[0071] Step 2: After the coal mining face is mined, retain the roadway according to the existing roadway filling method, and use double-row metal hinged roof beams (1) and single hydraulic props (5) to strengthen the roof support beside the roadway, and the inner side of the single hydraulic prop Install the filling template (4), and install the cord (2) inside the template;
[0072] Step 3: Fill the inner side of the curtain wit...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com