A construction method and concrete technology, applied in the direction of construction, building structure, construction material processing, etc., can solve the problems affecting the use function of workshop, irregular cracks, delamination, etc., achieve good three-dimensional restraint ability, improve surface strength, Improve the overall effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] The present invention will be further described below in conjunction with the drawings:
[0038] Such as Figure 1 ~ Figure 3 As shown, the steps of the construction method of the huge area non-reinforced wear-resistant concrete floor of the present invention are as follows:
[0039] 1) Foundation treatment: When the allowable live load standard value of the floor design is 60~120KPa, use the 300~600mm thick 3:7 lime soil to roll the foundation1; when the floor design allowable live load standard value is 125~160KPa, Use 600~900mm graded gravel to roll the foundation 1;
[0040] 2) The concrete is designed according to the following mixing ratio: ①The water-binder ratio of concrete is 0.45~0.5, the initial setting time is 8~12h, and the slump is 120㎜±20㎜; ②Incorporating pumping, water reducing and retarding compound additives ③Add 0.6~0.9kg anti-cracking PP fiber per cubic meter of concrete; ④Select 42.5 grade PO moderate heat cement, concrete cement dosage is 280~320kg / m3; ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| slump | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 