A bridge pier structure and construction method combining prefabrication and cast-in-place

A construction method and combined technology, applied in bridges, bridge parts, bridge construction, etc., can solve the problems of unclean formwork, multiple manpower, material resources and equipment, tight construction period, etc., to avoid mold explosion safety accidents and reduce on-site construction. Effects of risk, rapid construction conditions

Active Publication Date: 2016-02-17
CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 2. Large investment
For projects with a large number of bridge piers, heavy tasks, and tight construction schedules, more manpower, material resources, and equipment must be invested;
[0005] 3. Prone to quality problems
Using the existing technology will cause quality problems such as honeycomb, pockmarked surface, holes or exposed bars due to various reasons such as unclean formwork; in recent years, serious safety quality problems such as concrete expansion and explosion caused by various factors Accidents do happen

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A bridge pier structure and construction method combining prefabrication and cast-in-place
  • A bridge pier structure and construction method combining prefabrication and cast-in-place
  • A bridge pier structure and construction method combining prefabrication and cast-in-place

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.

[0030] Such as figure 1 and image 3 As shown, the combined prefabricated and cast-in-place bridge pier structure includes at least two prefabricated reinforced concrete shells 1 and cast-in-situ concrete 2 , and the cast-in-place concrete 2 is located inside the prefabricated reinforced concrete shell 1 . Each of the prefabricated reinforced concrete shells 1 includes a shell 11, the upper and lower ends of the shell 11 are horizontally provided with horizontal steel plates 14, and each of the horizontal steel plates 14 is provided with a plurality of bolt holes for connecting at least two The prefabricated reinforced concrete shell 1 is connected by bolts 19, and a plurality of vertical main bars 12 are arranged between the inner wall and the outer wall of the shell 11, and a plurality of stirrups 18 are bound horizontally around the outer ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a prefabricated and cast-in-place bridge pier structure and a construction method. The structure and the method relate to the technical field of bridge construction. The prefabricated and cast-in-place bridge pier structure comprises at least two prefabricated reinforced concrete outer shells and cast-in-place concrete; the prefabricated reinforced concrete outer shells are first manufactured in a factory in a centralized way; when the bridge pier structure is constructed, the prefabricated reinforced concrete outer shells which are manufactured are lifted to the design positions of bridge piers; then the at least two prefabricated reinforced concrete outer shells are connected; then the joints of the prefabricated reinforced concrete outer shells are sealed by cementing materials; finally cast-in-place concrete is cast in the prefabricated reinforced concrete outer shells which are connected, cured and formed. Due to the adoption of the prefabricated and cast-in-place bridge pier structure and the construction method, the bridge pier construction procedures are simplified, manpower, materials and equipment required for the construction are reduced, and the construction has higher quality, is safer and has higher efficiency.

Description

technical field [0001] The invention relates to the technical field of bridge construction, in particular to a bridge pier structure combined with prefabrication and cast-in-place and a construction method. Background technique [0002] The existing bridge piers made of reinforced concrete basically use steel formwork, wooden formwork or combined formwork, and are constructed on-site by climbing formwork or turning formwork. During the construction process, steel bars must be bound, installed, adjusted, and replaced. , Dismantle and maintain the formwork. Although this method can satisfy the construction of bridge piers, it has the following defects: [0003] 1. The process is complicated, labor-intensive and time-consuming. The site involves the installation, adjustment, replacement, demolition and maintenance of steel bars and formwork. For projects with high requirements on the appearance of concrete, a large amount of post-concrete surface modification work is required...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D19/02E01D21/00
Inventor 李军堂涂满明王东辉胡雄伟胡军张维汪芳进覃勇刚张爱花
Owner CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD