A kind of emulsified asphalt waterproof mortar and preparation method thereof
A technology for emulsified asphalt and waterproof mortar, applied in the field of waterproof chemical materials, can solve problems such as poor compatibility, corrosion, falling, etc., and achieve the effects of excellent workability, low price and good flexibility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] The emulsified asphalt raw materials are proportioned according to the following (Table 1) (weight ratio, the same below):
[0031] Table 1 emulsified asphalt formula table (100 parts of emulsified asphalt)
[0032]
[0033] The manufacturing process of emulsified asphalt is as follows:
[0034] (1) Dehydrate the asphalt at 110°C-130°C for 1 hour to 2 hours, then heat it gently to 130°C-160°C, and measure it for later use;
[0035] (2), heat the tap water to 45°C-65°C, and measure it for later use;
[0036] (3) Add the emulsifier and stabilizer to the spare hot water, stir evenly to make an emulsified aqueous solution, control the temperature at 45°C-65°C, and set aside;
[0037] (4) Turn on the emulsifier system, pour the emulsified aqueous solution that meets the temperature requirements into the emulsification, and immediately pour in the hot asphalt that meets the temperature requirements, and the emulsified asphalt that meets the requirements is prepared.
[...
Embodiment 2
[0052] The emulsified asphalt raw materials are proportioned according to the following (Table 3) (weight ratio, the same below):
[0053] Table 3 emulsified asphalt formula table (100 parts of emulsified asphalt)
[0054]
[0055] Emulsified asphalt manufacturing process such as embodiment 1
[0056] B component carries out proportioning (weight ratio, the same below) as follows (Table 4):
[0057] Table 4 B component of asphalt waterproof mortar (100 parts of paint)
[0058] cement
filler 1
filler 2
Auxiliary
[0059] gray cement
Quartz sand
50
18
30
2
[0060] Manufacturing process is as embodiment 1
[0061] Instructions:
[0062] The mixer was stirred at 70r / min for 5min.
[0063] After testing its performance is as follows:
[0064]Bond strength (28d): 1.3MPa, impermeability pressure (28d): 1.65MPa, compressive strength (28d): 25.4MPa, flexural strength (28d): 8....
Embodiment 3
[0066] The emulsified asphalt raw materials are proportioned according to the following (Table 5) (weight ratio, the same below):
[0067] Table 5 emulsified asphalt formula table (100 parts of emulsified asphalt)
[0068]
[0069] Emulsified asphalt manufacturing process such as embodiment 1
[0070] B component carries out proportioning (weight ratio, the same below) as follows (Table 6):
[0071] Table 6 Bituminous waterproof mortar B component (100 parts of paint)
[0072] cement
filler 1
filler 2
Auxiliary
gray cement
Quartz sand
50
15
33
2
[0073] The manufacturing process of asphalt waterproof mortar is as embodiment 1
[0074] Instructions:
[0075] The mixer was stirred at 80r / min for 3min.
[0076] After testing its performance is as follows:
[0077] Tensile strength: 1.35MPa, elongation at break: 293.77%, water impermeability (0.3MPa, 30min): impervious to water. ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| pressure | aaaaa | aaaaa |
| compressive strength | aaaaa | aaaaa |
| flexural strength | aaaaa | aaaaa |