Method for using deep hole pre-grouting to reinforce top plate
A pre-grouting and pre-reinforcement technology, applied in earthwork drilling, shaft lining, tunnel lining, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0010] 1) According to the geological data raised in the large mining height working face, and according to the range to be pre-reinforced, three rows of drill holes are arranged in a cross shape, and the angle of the drill holes is adjusted to control the position of the final hole to achieve an effective distance of multiple points and multiple surfaces reinforcement.
[0011] 2) The drill hole is drilled deep into the area 5m above the top of the mining face to form a plum blossom shape for reinforcement. The grouting material is 525# cement and the corresponding proportion of XPM nano perfusion agent is added for consolidation. No shrinkage, 5s coagulation, water reduction rate of 37%, high stone strength, compressive strength can be increased by 200%-300%, non-toxic, harmless, and non-polluting performance characteristics.
[0012] 3) Set the grouting station at a distance of 15-30m from the working face before construction, and arrange a 2TGZ-60 / 210 drilling rig, a mixer...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More