A vertical waste heat boiler module hoisting construction method
A technology of waste heat boiler and construction method, which is applied in the field of engineering construction, can solve the problems of high cost and long construction period, and achieve the effect of convenient operation and saving input costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The specific implementation manners of the present invention will be described below in conjunction with the accompanying drawings. The hoisting construction method adopts the hoisting method of row-by-row and block-by-block, and two sets (eight groups of 100 tons) of hydraulic lifting devices are installed to implement the hoisting work of each row of modules. Each column of modules is completed by top-down, block-by-block docking, flip-chip assembly, and one-time positioning; the first column is lifted at the original position, and the second column is in the direction of the center to the left (third column) of the furnace After the position of displacement s1 is hoisted to the in-place height, it is then translated into place. When in place, the elevation of the base is increased by the compensation amount h1. The second row is a higher than the first row; the third row is hoisted at the position where its center is shifted to the left direction of the furnace by s2...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 