Construction method of saponified slag foundation
A construction method and technology of saponified slag, which is applied in the construction field of saponified slag foundation, can solve problems such as the inability to realize mixed soil foundation and limit value-added use, and achieve the effect of simple and convenient construction method and high economic benefit
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0021] The saponified slag discharged by the water method is used for the construction of the saponified slag foundation, and the humidity of the saponified slag is controlled within 10%. First, sample the saponification slag, conduct a mixing degree experiment, mix the saponification slag with the original soil of the foundation, and measure the compaction degree when the added volume of saponification slag is 5% and 8%, and obtain the saponification according to the measured compaction degree The optimal mixing volume ratio of slag; according to the optimal mixing volume ratio, saponification slag and foundation soil are mixed, and then the compaction test and the optimal humidity test after compaction are carried out according to two thicknesses of 30cm and 50cm.
[0022] Excavate drainage ditches on one side of the foundation to be constructed for drainage, and then turn over the foundation to be constructed, with a thickness of more than 1m and reduce the moisture content ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com