A pedestrian bridge and its construction method

A technology for pedestrian bridges and construction methods, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as deep foundation pit depth, large excavation volume, and traffic jams during the construction period, and achieve depth and area reduction, construction Reduced excavation volume and low construction cost

Active Publication Date: 2015-12-09
袁翰孜 +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. Regardless of the use of friction piles, end-bearing piles, prefabricated piles or bored piles, there are problems of large construction area and deep foundation pits. During construction, it is necessary to protect the surrounding building foundations and set up pit wall supports
At the same time, due to geological or groundwater and other reasons, the pit wall supports a large area, resulting in difficult construction, high construction costs and long construction period
[0004] 2. During the construction, the amount of excavation was large, and the dust and mud generated seriously affected the lives of the surrounding residents.
The long construction period will also lead to long traffic jams
[0005] 3. Due to the large depth of the foundation pit, it is easy to affect the urban underground pipelines and cables during the construction of the pile foundation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A pedestrian bridge and its construction method
  • A pedestrian bridge and its construction method
  • A pedestrian bridge and its construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0053] like figure 1As shown, a pedestrian bridge includes a bridge body 1, and also includes a plurality of elongated concrete foundation caps 2 arranged at intervals, and the upper surfaces of a plurality of concrete foundation caps 2 together form a supporting plane 3, and the adjacent concrete An underground pipeline channel 6 is formed between the foundation caps 2; it also includes a plane steel frame 4 arranged on the supporting plane 3;

[0054] Such as figure 2 As shown, the construction method of the pedestrian bridge includes the following steps:

[0055] Step 1: Determine the spacing of the concrete foundation caps according to the distribution of underground pipelines at the construction location; determine the arrangement of the concrete foundation caps 2 according to the geographical conditions of the construction location;

[0056] Step 2: Cast-in-situ or prefabricated concrete foundation cap 2;

[0057] Step 3: excavate the foundation pit 8 at the construc...

Embodiment 2

[0073] In this embodiment, on the basis of Embodiment 1, the pedestrian bridge and its construction method are further described.

[0074] The weight of the bridge body 1 is 50T, the length is 25m, and the width is 2m.

[0075] The width of the concrete foundation cap 2 is 0.6m, the height is 1m, and the length is 3m.

[0076] The number of concrete foundation caps 2 is 6, and the distance between the concrete foundation caps 2 is 4.16m.

[0077] The pillar 5 is made of a steel pipe with a diameter of 0.6 m, and the number of the pillar 5 is four.

[0078] The length of the plane steel frame 4 is 27m, and the width is 2m. The plane steel frame 4 is made of 0.3m high I-beam. Connecting section 42 between parallel sections 41 . The intersecting position of the connecting section 42 corresponds to the concrete foundation cap 2 , a flange 10 is arranged at the intersecting position of the connecting section 42 , and the pillar 5 is welded to the flange 10 . The axis of the con...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a pedestrian bridge. The pedestrian bridge comprises a bridge body, and further comprises a plurality of long-strip-shaped concrete foundation platforms which are arranged at intervals, wherein the upper surfaces of the plurality of the concrete foundation platforms together form a bearing plane, and an underground pipeline channel is formed between each two adjacent concrete foundation platforms. Furthermore, the pedestrian bridge comprises a plane steel frame arranged on the bearing plane and a support pillar arranged on the plane steel frame, wherein the bridge body is supported by the support pillar. The invention further discloses a construction method of the pedestrian bridge. According to the pedestrian bridge and the construction method thereof, the plurality of the long-strip-shaped concrete foundation platforms are used to replace traditional pile foundations to support the pedestrian bridge, and the depth and the area of a foundation pit are greatly decreased under the circumstance that the same support effects are obtained. Due to the fact that the depth and the area of the foundation pit are greatly decreased, a person does not need to protect peripheral building foundations or arrange pit wall supports in construction, and the construction is simple and convenient, a construction period is short, construction cost is low, and furthermore no influence can be caused to underground pipelines.

Description

technical field [0001] The invention relates to a bridge and a bridge construction method. Background technique [0002] In my country, urban pedestrian bridges mainly use deep pile foundations. As far as the current construction of urban pedestrian bridges is concerned, there are the following problems: [0003] 1. Regardless of the use of friction piles, end-bearing piles, prefabricated piles or bored piles, there are problems of large construction area and deep foundation pit depth. During construction, it is necessary to protect the foundation of the surrounding buildings and set up pit wall supports. At the same time, due to reasons such as geology or groundwater, the supporting area of ​​the pit wall is large, resulting in difficult construction, high construction cost and long construction period. [0004] 2. The large amount of excavation during construction will seriously affect the lives of surrounding residents due to the dust and mud generated. The long const...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D1/00E01D21/00
Inventor 袁翰孜徐萍
Owner 袁翰孜
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More