A pedestrian bridge and its construction method
A technology for pedestrian bridges and construction methods, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as deep foundation pit depth, large excavation volume, and traffic jams during the construction period, and achieve depth and area reduction, construction Reduced excavation volume and low construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] like figure 1As shown, a pedestrian bridge includes a bridge body 1, and also includes a plurality of elongated concrete foundation caps 2 arranged at intervals, and the upper surfaces of a plurality of concrete foundation caps 2 together form a supporting plane 3, and the adjacent concrete An underground pipeline channel 6 is formed between the foundation caps 2; it also includes a plane steel frame 4 arranged on the supporting plane 3;
[0054] Such as figure 2 As shown, the construction method of the pedestrian bridge includes the following steps:
[0055] Step 1: Determine the spacing of the concrete foundation caps according to the distribution of underground pipelines at the construction location; determine the arrangement of the concrete foundation caps 2 according to the geographical conditions of the construction location;
[0056] Step 2: Cast-in-situ or prefabricated concrete foundation cap 2;
[0057] Step 3: excavate the foundation pit 8 at the construc...
Embodiment 2
[0073] In this embodiment, on the basis of Embodiment 1, the pedestrian bridge and its construction method are further described.
[0074] The weight of the bridge body 1 is 50T, the length is 25m, and the width is 2m.
[0075] The width of the concrete foundation cap 2 is 0.6m, the height is 1m, and the length is 3m.
[0076] The number of concrete foundation caps 2 is 6, and the distance between the concrete foundation caps 2 is 4.16m.
[0077] The pillar 5 is made of a steel pipe with a diameter of 0.6 m, and the number of the pillar 5 is four.
[0078] The length of the plane steel frame 4 is 27m, and the width is 2m. The plane steel frame 4 is made of 0.3m high I-beam. Connecting section 42 between parallel sections 41 . The intersecting position of the connecting section 42 corresponds to the concrete foundation cap 2 , a flange 10 is arranged at the intersecting position of the connecting section 42 , and the pillar 5 is welded to the flange 10 . The axis of the con...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com