Debugging method and system for hydroelectric power station monitoring system

A monitoring system and debugging method technology, applied in the direction of circuit devices, electrical components, etc., can solve the problems of cumbersome debugging and modification, confusion of power plant side monitoring system, cumbersome process, etc., to achieve simple and reliable debugging and modification, reduce test risk, and improve test efficiency Effect

Active Publication Date: 2014-12-10
STATE GRID CORP OF CHINA +1
View PDF3 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. During the commissioning process, the risk of equipment operation is high. The centralized control side is integrated into the existing monitoring system that has been put into operation before the on-site LCU test is carried out. Participating in the LCU causes huge operational risks;
[0004] 2. The debugging and modification are cumbersome. If the database needs to be modified during the debugging process, all servers must be modified synchronously. The workload is heavy and the process is cumbersome. The debugging personnel are prone to negligence, which invisibly brings risks to the debugging;
[0005] 3. There is a high risk of modifying the database of the host computer on the power plant side in the early stage. Since the power plant side system belongs to the operating system, the workload of the database modification in the early stage is heavy and the time is tight. Incorrectness will not only affect the follow-up test, but also may cause confusion in the monitoring system of the power plant side, and even cause the overall collapse of the monitoring system of the power plant side;
[0006] 4. It is very difficult to control the full stop time during the commissioning test. When the centralized control side is connected to the power plant side for the first time, it is necessary to apply for a full stop of the whole station. In the AGC and AVC tests, the local LCU control units of the whole plant are connected to each other. It is also necessary to apply for a full stop of the whole station during the commissioning test. Due to the existence of a large number of test items and the corresponding unpredictable situations, it is difficult to control the time of the full stop of the whole station

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Debugging method and system for hydroelectric power station monitoring system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0034] The present invention builds a set of monitoring systems that are completely equivalent to the side monitoring system of the B power plant in the A dispatching building 50 kilometers away from the power plant area, and are mutually backup monitoring systems to meet the basic technical requirements of remote centralized control.

[0035] Such as figure 1 As shown, the present invention includes the provincial regulation side, the power plant side monitoring system, the centralized control side monitoring system, the local LCU, the virtual power plant host computer system, the debugging network and several debugging switches. The power plant side monitoring system includes RTU and multiple one-way 104 protocol receivers. The monitoring system on the centralized control side includes multiple monitoring computers and a centralized control ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a debugging method and system for a hydroelectric power station monitoring system. The debugging method includes: establishing a set of an upper computer system for a virtual power plant on a power plant side, wherein the upper computer system is used for simulating a monitoring system on the power plant side; integrally transplanting an upper computer platform on the power plant side to the upper computer system of the virtual power plant; setting up a temporary debugging network, connecting the upper computer system of the virtual power plant with a monitoring system on the centralized control side, and guaranteeing isolation with an existing running system; subjecting LCUs (local control units) on the power plant side to single testing and integral testing through the upper computer system of the virtual power plant; after integral testing is fully completed, applying for full stop of the whole site, integrally moving the upper computer system platform of the virtual power plant, completed in test back to the monitoring system on the power plant side, cancelling control over the upper computer system of the virtual power plant, realizing actual connection of the monitoring system on the centralized control side with the monitoring system on the power plant side, and verifying consistency of databases of the systems and accuracy of equipment control instructions. The debugging method and system is low in risk and influence, high in efficiency and complete in test.

Description

technical field [0001] The invention relates to a debugging method and a debugging system of a monitoring system of a hydropower plant. Background technique [0002] The traditional hydropower plant monitoring system debugging method is divided into three steps: first, complete the compilation of the databases, operation orders, lock-up library and calculation library of the upper computer on the centralized control side, then stop the power plant completely, and connect the centralized control side and the power plant side to the network. Modify the relevant database on the power plant side, check the basic switching function, data transmission and blocking function; then carry out a separate test for each local LCU (LCU: logic control unit logic control unit) on the power plant side and the centralized control side respectively; finally combined with the AGC test (AGC: auto generator control automatic power generation control), AVC (AVC auto volt control automatic voltage ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H02J13/00
Inventor 杨建斌毛琦邹桂丽王铁良吴扬文杨建明周艳龙丰德强王冠群王超衡谢志成吴晓兰刘明珠向研田太晋皮辉
Owner STATE GRID CORP OF CHINA
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More