A protective layer and decorative surface technology, applied in the direction of floors, floors, building components, etc., can solve the problems of increasing the process, increasing the load and cost of the building, increasing carbon emissions, etc., to improve the overall compressive capacity, reduce load and cost , the effect of protecting the environment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0089] The floor slab with decorative surface protective layer that the present invention proposes has many optional factors, and various embodiments can be designed, so specific embodiments are only used as illustrations of specific implementations of the present invention, and do not constitute limitations on the scope of the present invention. limit. In order to specifically describe the present invention, the following examples are selected for illustration.
example 1
[0090] Example 1: Floor layer pouring 1000 square meters
[0091] 1. The formwork is pre-supported before pouring, the distance between the horse stool support is 1m×1m, and the Φ10mm two-way double-layer steel bars are fully tied, and the distance is 10cm×15cm;
[0092] 2. The concrete slump is 160mm, and the sky pump transports it up to the floor construction surface for paving;
[0093] 3. Laser control (level and flatness) imported mechanical paving equipment to implement vibration, leveling, and compaction until the design surface elevation is 14cm thick;
[0094] 4. The manual push rod eliminates the marks left between the rows of paving equipment;
[0095] 5. After the initial setting, the double-disc disc receiver collects light;
[0096] 6. The concrete is sprinkled with water 2-3 times a day to keep it moist for 30 minutes and cured for 10 days;
[0097] 7. Use dry concrete polishing equipment to roughly grind the surface of the metal carcass with a 60-mesh grindi...
example 2
[0106] Example 2: Floor layer pouring 1000 square meters
[0107] 1. The formwork is pre-supported before pouring, the distance between the horse stool support is 1m×1m, and the Φ10mm two-way double-layer steel bars are fully tied, and the distance is 15cm×15cm;
[0108] 2. The concrete slump is 180mm, and the sky pump transports it up to the floor construction surface for paving;
[0109] 3. Laser control (level and flatness) imported mechanical paving equipment to implement vibration, leveling, and compaction until the design surface elevation is 14cm thick;
[0110] 4. The manual push rod eliminates the marks left between the rows of paving equipment;
[0111] 5. After the initial setting, the single-disk disc receiver collects light;
[0112] 6. The concrete is sprinkled with water 2-3 times a day to keep it moist for 30 minutes and cured for 10 days;
[0113] 7. Use imported dry concrete polishing equipment to coarsely grind the surface of the metal carcass with 30 mes...
PUM
Property | Measurement | Unit |
---|---|---|
Flatness | aaaaa | aaaaa |
Flatness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com