down-and-fill mining method
A mining method and access filling technology, applied in underground mining, filling, surface mining, etc., can solve the problems of difficult production safety, high loss dilution rate, low mining efficiency, etc., to increase sales revenue, improve total the effect of improving resource utilization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0025] Include the following steps:
[0026] (1) Divide the approach into several approaches in the layered entry. First, the first approach is mined. After the first approach is mined and filled firmly, the rest of the approaches are mined and filled in sequence; the height of each approach is 2.5 m, the width of the approach is 2.5m, that is, the section of the slitting approach is 2.5m×2.5m;
[0027] (2) The layered approach adopts pneumatic picks to vibrate ore, and manually loads and pushes for transportation;
[0028] (3) After each access road is mined, steel bars are laid on the access floor. The main reinforcement with a diameter of 14mm is arranged vertically. The mesh of the main reinforcement and auxiliary reinforcement is 200×200mm, and then pouring mortar, the thickness of the mortar is 0.5m, to form the access mortar backing plate; As an artificial false roof for the next level.
[0029] (4) Tailings, fly ash or excavation rock filling shall be carried out 24...
Embodiment 2
[0033] Include the following steps:
[0034] (1) Divide the approach into several approaches in the layered entry. First, the first approach is mined. After the first approach is mined and filled firmly, the rest of the approaches are mined and filled in sequence; the height of each approach is 3m , the width of the route is 2.5m, that is, the section of the slitting route is 3m×2.5m;
[0035] (2) The layered approach adopts shallow hole loosening blasting, manual loading, pushing and transportation;
[0036] (3) After each access road is mined, steel bars are laid on the access floor. The main reinforcement with a diameter of 12mm is arranged vertically. The mesh of the main reinforcement and auxiliary reinforcement is 200×200mm, and then pouring mortar, the thickness of the mortar is 0.5m, to form the access mortar backing plate; As an artificial false roof for the next level.
[0037] (4) Tailings, fly ash or excavation rock filling shall be carried out 24 hours after th...