Slick water applied to shale gas industrialized fracturing exploitation and preparation method thereof
A factory-like, shale gas technology, applied in the field of slick water, can solve the problems of long fracturing construction period, high fluid mixing requirements, and long fluid mixing time, and achieves improved dissolution rate and salt resistance, simple formula, and liquid speed effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0046] The invention provides a new slick water and its preparation process. The slick water includes emulsion drag reducer, bactericide, clay stabilizer, drainage aid and clear water, wherein the ratio of each component is: emulsion Drag-reducing agent 0.05%-0.1%, fungicide 0.1%-0.2%, clay stabilizer 0.1%-0.2%, drainage aid 0.09%-0.11%, and the balance is clear water. And the preparation process about this kind of slippery water is then as follows:
[0047] First, the emulsion drag reducer, clay stabilizer and drainage aid were prepared respectively. The preparation steps of emulsion drag reducing agent are as follows:
[0048] (1) Hydrolyze acrylamide with distilled water, and mix sodium acrylate and acrylamide hydrolyzate to form a mixed solution 1;
[0049] (2) Mix liquid paraffin and Span-80 to form a mixture II;
[0050] (3) Add any sulfonate to the mixed solution 1, and stir evenly to form the mixed solution 3;
[0051] (4) Add mixed solution 3 to mixed solution 2 a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com