A generator set and capacity technology, which is applied in the direction of controlling generators, control systems, electrical components, etc., can solve problems such as insufficient loading capacity, and achieve the effects of optimizing loading performance, improving loading capacity, and reducing model selection
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Based on the above, this embodiment provides a method for improving the loading capacity of a generator set, which is applied to the generator set and at least one load connected to the generator set that is controlled by a frequency converter. The flow chart of the method is as follows: figure 2 shown, including the following steps:
[0046] Step S101 , providing a generator set and at least one first load connected to the generator set, wherein the opening and closing of the first load is controlled by a frequency converter. It can also be said that the first load is the frequency converter load.
[0047] Step S102: When the second load connected to the generator set increases, the operating frequency of the inverter is reduced, wherein the second load is controlled to start and close by the soft starter. The genset load controlled by the starter. The generator set load is all the loads loaded on the generator set, including the inverter load and the soft starter lo...
Embodiment 2
[0072] Based on the first embodiment, this embodiment also provides a system for implementing a method for improving the loading capacity of a generator set, that is, a system for improving the loading capacity of a generator set. The schematic diagram is as follows: Figure 10 shown, including:
[0073] The generator set 10 is used to provide working power for at least one first load 21 connected to the generator set 10, wherein the first load 21 is controlled to be turned on and off by a frequency converter (not shown in the figure).
[0074] The controller 30 is used to reduce the operating frequency of the inverter when detecting that the second load 22 is loaded on the generator set 10, wherein the controller is connected to the generator set 10, the first load 21 and the second load 22, and the second load 22 is controlled on and off by a soft starter (not shown).
[0075] According to an embodiment of the present invention, reducing the operating frequency of the frequen...