Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum

A technology for subway stations and construction methods, which is applied to earthwork drilling, underground chambers, shaft equipment, etc., and can solve problems such as impact damage to the second lining of vaults, large abandoned projects, and high risks

Inactive Publication Date: 2015-07-08
CHINA RAILWAY ERYUAN ENG GRP CO LTD
View PDF5 Cites 24 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Both the double-side-wall pilot-pit method and the hole pile (column) method are suitable for weak surrounding rock conditions. The use of the double-side-wall pilot-pit method in medium and slightly weathered rocks has the following disadvantages: First, the blasting excavation impact damage has been completed temporarily support and initial support; second, the construction period is long, the risk is high, and the abandoned project is large; the third is that the risk of removing the temporary support before the construction of the second lining is relatively high
The use of hole pile (column) method in medium and slightly weathered rocks has the following disadvantages: one is to use conventional blasting to excavate and impact and destroy the completed permanent structures such as columns, arches, and middle plates, and to use weak blasting, which will result in high costs and long construction periods; Second, the construction risk of artificial and blasting excavated piles is high; third, the quality of structure and waterproof construction is poor
The two-lined arch cover method has the following disadvantages: first, the settlement of the vault is large when the temporary support is removed, and the settlement control is difficult and the risk is high; second, the waterproof layer and structural integrity at the interface between the arch foot and the top of the wall are not good, and the project quality is affected ; The third is that the blasting construction of the lower part of the tunnel may cause impact damage to the completed second lining of the vault

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum
  • Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The present invention will be further described below in conjunction with drawings and embodiments.

[0018] refer to figure 1 and figure 2 , the underground excavation construction method of the large-span subway station in the upper soft lower hard stratum of the present invention comprises the following steps:

[0019] 1. The upper and lower steps of the left and right parts of the station arch are excavated in a total of 4 parts. The upper step 1 on the right side is excavated first, and the first layer of initial support 11 and the upper part of the temporary partition wall 13 are constructed.

[0020] 2. Excavate the lower step 2 on the right side, and construct the lower part of the temporary partition wall 13.

[0021] 3. Excavate the upper step 3 on the left side, and implement the first layer of initial support 11 for this part.

[0022] 4. Excavate the lower step 4 on the left side.

[0023] 5. After the excavation of the arch is completed, the intermedi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an underground excavation construction method of a large-span subway station in a flexible-top and hard-bottom stratum, and aims at effectively reducing the construction risk and increasing the excavation construction efficiency. The method comprises the steps of constructing an arch part by the left part and the right part; constructing a temporary partition wall in the middle of the arch part constructing a first initial support for the arch part; removing the temporary partition wall in the middle within a short circulation after excavating the arch part; constructing a second initial support; gradually thickening from the top to the bottom of the arch to form a structural form that large arch feet are formed at the end parts; connecting the first initial support and the second initial support through reinforcing steel bars to form overlapped initial support arch covers; excavating the rest rock by a pulling trough step method under the protection of the double-layer overlapped initial support arch covers until reaching the bottom part of the tunnel; sequentially constructing a two-lining structure and the inner structure of the station from bottom to top.

Description

technical field [0001] The invention relates to tunnel engineering, in particular to a construction method for underground excavation of a large-span subway station in upper soft and lower hard strata. Background technique [0002] In cities such as Chongqing, Dalian, Xiamen, and Qingdao, the bedrock is buried shallowly, and the construction of subway stations avoids the problems caused by conventional open cut or cover excavation construction, which cause a large number of problems such as pipeline relocation, greening relocation, and traffic congestion. Controlled by the depth of burial, the main structure of many subway stations is located in rock strata that are soft at the top and hard at the bottom, that is, the vaults are located in strongly weathered and moderately weathered rocks, and the arch feet are located in moderately or slightly weathered rocks. The structure is mostly in moderately and lightly weathered rock. [0003] The traditional underground excavation ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D11/00E21D21/00
CPCE21D9/00E21D11/00E21D21/00
Inventor 李德才史宣陶敖贵勇徐亮喻波苟明中张建祥林刚郭俊王安东
Owner CHINA RAILWAY ERYUAN ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products