Warm Mix Additives for Improving Asphalt High Temperature Stability and Its Application
A high-temperature stability and additive technology, applied in the field of road asphalt materials, can solve the problems of difficulty in effectively coordinating warm mixing and high-temperature performance, large emission of harmful gases, affecting the high-temperature performance of asphalt, etc., and achieves significant viscosity reduction and softening. The effect of improving and reducing high temperature viscosity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Preparation of a warm mix additive to improve the high temperature stability of asphalt:
[0025] Weigh the following raw materials in parts by weight: 15 parts of polypropylene, 10 parts of polyethylene, 8 parts of stearic acid, 45 parts of ethylene bisstearamide and 30 parts of oxidized polyethylene wax, and place the above raw materials in the above sequence at room temperature Put it into the stirring tank, and after stirring for 30 minutes, it will be the finished product of warm mixing additive. (the density of polyethylene used in it is 0.910g / cm 3 , the melting point of oxidized polyethylene wax is 95°C, and the melting index of polypropylene is 28g / 10min)
[0026] 400g70 # Heat the road asphalt to 140°C until the asphalt flows completely, add the warm mixing additive prepared in Example 1, the amount of the added warm mixing additive is 2% of the weight of the asphalt, start the stirring equipment to stir, and the stirring speed is 450r / min Stir for 60 minut...
Embodiment 2
[0028] Preparation of a warm mix additive to improve the high temperature stability of asphalt:
[0029] Weigh the following raw materials in parts by weight: 20 parts of polypropylene, 10 parts of polyethylene, 9 parts of stearic acid, 50 parts of ethylene bisstearamide and 35 parts of oxidized polyethylene wax, and place the above raw materials in sequence at room temperature Put it into the stirring tank, and after stirring for 30 minutes, it is the finished product of warm mixing additive. (the density of polyethylene used in it is 0.920g / cm 3 , the melting point of oxidized polyethylene wax is 105°C, and the melting index of polypropylene is 35g / 10min)
[0030] 400g70 # Heat the road asphalt to 140°C until the asphalt flows completely, add the warm mixing additive prepared in Example 2, the amount of the added warm mixing additive is 3% of the weight of the asphalt, start the stirring equipment to stir, and the stirring speed is 550r / min Stir at low temperature for 50 ...
Embodiment 3
[0032] Preparation of a warm mix additive to improve the high temperature stability of asphalt:
[0033] Weigh the following raw materials in parts by weight: 25 parts of polypropylene, 10 parts of polyethylene, 10 parts of stearic acid, 35 parts of ethylene bisstearamide and 50 parts of oxidized polyethylene wax, and place the above raw materials in sequence at room temperature Put it into the stirring tank, and after stirring for 10 minutes, it is the finished product of warm mixing additive. (The density of polyethylene used in it is 0.940g / cm 3 , the melting point of oxidized polyethylene wax is 100°C, and the melting index of polypropylene is 28g / 10min)
[0034] 400g70 # Heat the road asphalt to 130°C until the asphalt flows completely, add the warm mix additive prepared in Example 3, the amount of the added warm mix additive is 3% of the weight of the asphalt, start the stirring equipment to stir, and the stirring speed is 550r / min Stir for 60 minutes until the additi...
PUM
| Property | Measurement | Unit |
|---|---|---|
| density | aaaaa | aaaaa |
| melting point | aaaaa | aaaaa |
| melt flow index | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 