[0028] Embodiment 1: The production method of the 1300MPa high-strength steel fiber steel adopts the following specific processes.
[0029] (1) The blast furnace molten iron is mixed into the converter for smelting, the weight percentage of the components in the converter tapping molten steel: C0.020%, P0.012%, S0.010%; 6kg / T of medium carbon ferromanganese is added to the ladle when tapping, Add lime 3kg / T later.
[0030] After the LF enters the station, add 2kg / T of lime, and raise the temperature to 1650°C, transport the molten steel to the RH furnace for OB operation, and use full pump vacuum treatment, the minimum vacuum degree is 140pa; after the OB is completed, the decarburization time of molten steel is 8 minutes. After decarburization, adjust the composition, add high-carbon ferromanganese 2.5kg / T for deoxidation alloying, the circulating time of molten steel is more than 11 minutes, and control the oxygen content of off-site to 30ppm.
[0031] (2) Lift the molten s...
Embodiment 2
[0036] Embodiment 2: The production method of the 1300MPa grade high-strength steel fiber steel adopts the following specific process.
[0037](1) The blast furnace molten iron is mixed into the converter for smelting, the weight percentage of the components in the converter tapping molten steel: C0.05%, P0.008%, S0.020%; 6kg / T of medium carbon ferromanganese is added to the ladle when tapping, Add lime 3kg / T later.
[0038] After the LF enters the station, add 2kg / T of lime, and raise the temperature to 1670°C, transport the molten steel to the RH furnace for OB operation, and use full pump vacuum treatment, the minimum vacuum degree is 120pa; after the OB is completed, the decarburization time of molten steel is 9 minutes. After decarburization, adjust the composition, add 3.0kg / T of high-carbon ferromanganese for deoxidation alloying, the circulating time of molten steel is 10 minutes, and control the oxygen content of off-site to 35ppm.
[0039] (2) Lift the molten steel ...
Embodiment 3
[0044] Embodiment 3: The production method of the 1300MPa grade high-strength steel fiber steel adopts the following specific processes.
[0045] (1) The blast furnace molten iron is mixed into the converter for smelting, the weight percentage of the components in the converter tapping molten steel: C0.03%, P0.009%, S0.014%; 6kg / T of medium carbon ferromanganese is added to the ladle when tapping, Add lime 3kg / T later.
[0046] After the LF enters the station, add 2kg / T of lime, and raise the temperature to 1660°C, transport the molten steel to the RH furnace for OB operation, and use full pump vacuum treatment, the minimum vacuum degree is 115pa; after the OB is completed, the decarburization time of molten steel is 9 minutes. After decarburization, the composition is adjusted, and high-carbon ferromanganese 2.8kg / T is added for deoxidation alloying, to ensure that the circulation time of molten steel is more than 12 minutes, and to control the off-site oxygen content to 32pp...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Tensile strength | aaaaa | aaaaa |
| Tensile strength | aaaaa | aaaaa |
| Tensile strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 