A maintenance platform for a flood discharge channel of a hydropower station and its erection method
A technology for flood discharge channels and maintenance platforms, which is applied in water conservancy projects, sea area projects, industrial buildings, etc. It can solve problems such as the quality of the flow channel bottom plate being damaged, affecting the construction progress, and increasing the construction cost, so as to reduce the difficulty of hoisting and assembly , to ensure safety and reliability, and to prevent the inclination angle from continuing to expand
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] Such as Figure 1-4 Shown, a kind of maintenance platform of flood discharge channel of hydropower station, it comprises front section underframe 1, intermediate connection underframe 2, tail section underframe 3, front hoist 4, rear hoist 5, lateral screw rod 6, bottom wheel 7, No. 1 pressure switch 8, bottom plate screw mandrel 9, side guide wheel 10, scaffolding 11, fixed pulley 12, No. 1 threaded flange plate 13, No. 2 threaded flange plate 14, bamboo springboard 15 and No. 2 pressure switch 16; The front hoist 4 is fixedly installed on the front bottom frame 1, and the bottom four corners of the front bottom frame 1 are respectively equipped with bottom wheels 7; The flange plate 13 is fixedly connected; the head of the tail section chassis 3 is fixedly connected with the tail of the intermediate connection chassis 2 through the second threaded flange plate 14; the tail section chassis 3 is fixedly equipped with a rear winch 5 , the four corners of the bottom of t...
Embodiment 2
[0062] According to attached Figure 5-12 , a detailed description of the construction method of the maintenance platform for the flood discharge channel of the hydropower station, which includes the following steps:
[0063] A. Set up a personnel channel 18 at the tail of the flood discharge channel 17 for personnel to climb to the floor of the flood discharge channel, and the operator enters into the interior of the flood discharge channel 17 through the personnel channel 18. The erected artificial channel 18 enables the operator to conveniently enter into the interior of the higher flood discharge channel 17, thereby facilitating subsequent manual work and assembly of the maintenance platform.
[0064] B. Transfer the front section underframe 1 equipped with the front winch 4 to the base plate at the afterbody of the flood discharge channel 17 with the crane 19. Firstly, the front section underframe 1 is hoisted in place, thereby facilitating the subsequent assembly statio...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com