Underwater construction method of deep foundation pit in water-rich sand layer
A technology of underwater construction and water-rich sand layer, which is applied in the direction of infrastructure engineering, excavation, construction, etc., can solve the problems of the influence of underground pipelines of surrounding buildings, adverse effects of foundation pit stability, and deep embedding depth of diaphragm walls, etc. Achieve the effects of reducing the surrounding surface settlement, reducing construction risks, and reducing the depth of embedding
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.
[0039] It should be understood that terms such as "having", "comprising" and "including" as used herein do not entail the presence or addition of one or more other elements or combinations thereof.
[0040] Figure 1-Figure 8 It shows an implementation form according to the present invention, which provides an underwater construction method for a deep foundation pit in a water-rich sand layer, referring to figure 1 , set a row of continuous walls 1 around the pre-excavation foundation pit, so that the continuous walls 1 form a circle, set crown beams 7 on the top of the continuous walls 1, and erect concrete supports 2 between the continuous walls 1, because The address condition of the water-rich sand layer is poor, and it is necessary to install crown beams 7 and concrete ...