Tower top frame assembly tool for tower crane
A technology for tower cranes and tower tops, applied to cranes, manufacturing tools, auxiliary devices, etc., can solve problems such as high cost, high labor intensity, and difficulty in ensuring accuracy, and achieve cost savings, labor intensity reduction, and welding time saving Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] In order to enable those skilled in the art to better understand the solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0019] Such as figure 1 and figure 2 As shown, the tower top frame tooling for a tower crane of the present invention includes a base frame 1, a backing plate 2, a support seat 3, a positioning seat I6, a positioning seat II9, and a positioning seat III10; The supporting seat 3 for fixing and supporting the tower top, and the positioning seat I6, such as Figure 6 As shown, there is a placement groove on the support seat 3 to prevent the chord on the top of the tower; Figure 5 As shown, a positioning hole is provided on the positioning seat I6, which matches the hole on the top chord of the tower, and is connected by a pin shaft; image 3 As shown, the four corners of the backing plate 2 are arranged with positioning seats III1...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 