A prefabricated seepage column device and construction method
A technology of cuboid and square prism, which is applied in the field of prefabricated seepage column devices, can solve the problems that grass-planting bricks cannot improve the permeability of the stratum, damage the ecological environment, and the effect is not obvious, so as to increase the ability of collecting rainwater, eliminate stagnant water, and improve The effect of water collection capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The present invention is described in detail below in conjunction with accompanying drawing:
[0035] A prefabricated leakage column device for accelerating ground water seepage, comprising a leakage column cuboid 1, a square prism 2, a water seepage hole 3, a water collection hole 4, a pyramid 5, and a drainage hole 6. During construction, the leakage column is to be laid at the position , remove the soil layer at a certain depth on the surface, and the removed thickness is equal to the distance from the top of the seepage column cuboid 1 to the bottom surface of the square prism 2, and then construct the seepage column according to the row spacing of 1m×1m. During construction, the seepage The leakage column is pressed into the formation, the bottom surface of the square column 2 of the leakage column is in contact with the ground after the surface soil has been removed and squeezed tightly, and then backfilled with pulverized coal slag 7 to a height equal to the top o...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


