Delay-based heuristic peak load reduction method
A heuristic, peak-load technology, which is applied in load forecasting, AC network circuits, electrical components, etc. in the AC network, can solve problems affecting user comfort, achieve the effect of reducing overlap and reducing peak load
- Summary
 - Abstract
 - Description
 - Claims
 - Application Information
 
 AI Technical Summary 
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] In order to make the technical problems, technical solutions and advantages to be solved by the embodiments of the present invention clearer, the following will describe in detail with reference to the drawings and specific embodiments.
[0045] Such as figure 1 As shown, it is a flow chart of the delay-based peak load reduction method in the intelligent power consumption of the present invention, including the following steps:
[0046] (1) The control center issues a peak load reduction command to the load agency; where the command is a 0-1 binary command, indicating whether the load agency is required to implement a load control algorithm for the periodic flexible load in its management area;
[0047] (2) The load agency obtains the power amplitude, duty cycle and period of the periodic flexible load in its management area;
[0048] (3) According to the parameters of the periodic flexible load, the load agency establishes the periodic flexible load model and all the ...
PUM
 Login to View More Abstract
Description
Claims
Application Information
 Login to View More - R&D
 - Intellectual Property
 - Life Sciences
 - Materials
 - Tech Scout
 
- Unparalleled Data Quality
 - Higher Quality Content
 - 60% Fewer Hallucinations
 
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com
