Steel pipe concrete column-steel beam outer separation plate type node structure and construction method thereof
A technology for concrete-filled steel tubular columns and concrete structures, which is applied in the directions of building components, building structures, and earthquake resistance to achieve the effects of enhanced combined action, reasonable design, and reduced size.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] Such as figure 1 , figure 2 , image 3 , Figure 4 and Figure 5 The concrete-filled steel tube column-steel beam outer diaphragm joint structure shown includes a steel tube concrete column, a steel beam 4 located outside the steel tube concrete column, and a beam connected between the steel tube concrete column and the steel beam 4 The column connection structure, the steel pipe concrete column and the steel beam 4 are arranged vertically.
[0062] The concrete-filled steel pipe column includes a rectangular steel pipe column 2, four groups of longitudinal ribs 1 with openings arranged on the four inner walls of the rectangular steel pipe column 2, and a core concrete structure 3 filled in the rectangular steel pipe column 2. The perforated longitudinal ribs 1 are all poured in the core concrete structure 3, and the structure and size of all perforated longitudinal ribs 1 in the four groups of perforated longitudinal ribs 1 are the same; each group of perforated l...
Embodiment 2
[0104] In this example, if Figure 7 , Figure 8 , Figure 9 and Figure 10 As shown, the adopted CFST column-steel girder outer diaphragm node structure is different from that of Embodiment 1 in that: the web connecting plate 6 and the steel girder 4 are connected by welding, and the four The perforated longitudinal ribs 1 are respectively arranged in the middle of the four inner side walls of the rectangular steel pipe column 2 .
[0105] In this embodiment, the structure and connection relationship of the remaining parts of the steel pipe concrete column-steel beam outer diaphragm joint structure are the same as those in Embodiment 1.
[0106] In this embodiment, the construction method of the steel pipe concrete column-steel girder external diaphragm joint structure is different from that in Embodiment 1 in that: when connecting the steel girders in step 3, the steel girder 4 and the web connection plate 6 are connected by Connected by welding.
[0107] In this embodi...
Embodiment 3
[0109] In this example, if Figure 11 , Figure 12 , Figure 13 and Figure 14 As shown, the adopted CFST column-steel girder outer diaphragm node structure is different from that of Embodiment 1 in that it also includes m stirrups 9 arranged on the four groups of longitudinal ribs 1 with openings from top to bottom. , the stirrups 9 of the m road are arranged in parallel, and the stirrups 9 of the m road are arranged perpendicular to the rectangular steel pipe column 2, wherein m is a positive integer and m≥3; the stirrups 9 of the m road are all poured in the core Inside the concrete structure 3;
[0110] The number of through holes 10 opened on the strip steel ribs is m, and the stirrups 9 of the m roads are respectively from the m through holes 10 opened on each of the strip steel ribs. through. Such as Figure 15 As shown, the through hole 10 is a slot-shaped hole.
[0111] In this embodiment, m=5.
[0112] During actual construction, the value of m can be adjuste...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com