Ball Mill Liner
A ball mill liner and room temperature technology, which is applied in grain processing and other directions, can solve a lot of manpower and material resources and other problems, and achieve the effects of energy saving, simple manufacturing method and prolonging service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Ball mill liner, including the following chemical composition in weight percentage: C0.54%, Si0.82%, Mn0.93%, Cr1.89%, Ni0.48%, Mo0.46%, RE0.032%, Al0.03 %, P0.023%, S0.021%, and the rest is Fe.
[0023] The preparation method of ball mill liner of the present invention comprises the following steps:
[0024] Step 1, batching: use scrap steel, ferrosilicon, ferromanganese, ferrochromium, ferronickel, ferromolybdenum, and alloy as raw materials to batch according to the ratio of the ball mill liner;
[0025] Step 2, smelting: put the prepared raw materials in step 1 into an electric arc furnace for smelting, and the smelting temperature is 1630°C;
[0026] Step 3, deployment: carry out element inspection and analysis on the molten steel in step 2, and carry out secondary proportioning of elements to the molten steel according to the inspection results;
[0027] Step 4. Refining: Put the molten steel that has passed the element inspection in step 3 into the LF refining ...
Embodiment 2
[0035] Ball mill liner, including the following chemical composition in weight percentage: C0.50%, Si0.97%, Mn1.12%, Cr1.81%, Ni0.39%, Mo0.35%, RE0.046%, Al0.034 %, P0.024%, S0.021%, and the rest is Fe.
[0036] The preparation method of ball mill liner of the present invention comprises the following steps:
[0037] Step 1, batching: use scrap steel, ferrosilicon, ferromanganese, ferrochromium, ferronickel, ferromolybdenum, and alloy as raw materials to batch according to the ratio of the ball mill liner;
[0038] Step 2, smelting: put the raw materials prepared in step 1 into an electric arc furnace for smelting, and the smelting temperature is 1640°C;
[0039] Step 3, deployment: carry out element inspection and analysis on the molten steel in step 2, and carry out secondary proportioning of elements to the molten steel according to the inspection results;
[0040] Step 4. Refining: Put the molten steel that has passed the element inspection in step 3 into the LF refining...
Embodiment 3
[0048] Ball mill liner, including the following chemical composition in weight percentage: C0.46%, Si0.82%, Mn1.15%, Cr1.95%, Ni0.45%, Mo0.32%, RE0.037%, Al0.036 %, P0.02%, S0.021%, and the rest is Fe.
[0049] The preparation method of ball mill liner of the present invention comprises the following steps:
[0050] Step 1, batching: use scrap steel, ferrosilicon, ferromanganese, ferrochromium, ferronickel, ferromolybdenum, and alloy as raw materials to batch according to the ratio of the ball mill liner;
[0051]Step 2, smelting: put the raw materials prepared in step 1 into the electric arc furnace for smelting, and the smelting temperature is 1620°C;
[0052] Step 3, deployment: carry out element inspection and analysis on the molten steel in step 2, and carry out secondary proportioning of elements to the molten steel according to the inspection results;
[0053] Step 4. Refining: Put the molten steel that has passed the element inspection in step 3 into the LF refining ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| tensile strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 