SBS (styrene-butadiene-styrene) modified asphalt and preparation method thereof
A technology of modified asphalt and its production method, which is applied in the direction of building components, building insulation materials, buildings, etc., can solve the problems of easy drying, cracking, softness, poor performance, etc., achieve good elasticity and toughness, improve fatigue resistance, and good The effect of resilience
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0026] A kind of SBS modified bitumen, comprises the base bitumen of 88.6%%, the SBS modifier of 6%, the stabilizer of 0.4% and the aromatic hydrocarbon oil of 5%, described stabilizer is by TMTD accelerator and sulfur powder with 2: 1, the SBS modifier can be thermoplastic styrene-butadiene rubber.
[0027] Its preparation method comprises the following steps:
[0028] Step 1: Transport 88.6% of the base asphalt to a high-temperature tank for heating to 185°C;
[0029] Step 2: Add base asphalt at a temperature of 185°C to the production tank, add 6% SBS modifier at the same time, and stir and mix for 2 hours;
[0030] Step 3, passing the stirred asphalt through a mill to fully dissolve it;
[0031] Step 4: Put the fully dissolved asphalt into the finished product tank, add 0.4% stabilizer and 5% aromatic oil into the finished product tank, stir and mix again and incubate for 1-2 hours to obtain SBS modified asphalt.
Embodiment 2
[0033] A kind of SBS modified asphalt, comprising 94.9% base asphalt, 4-6% SBS modifier, 0.1-0.4% stabilizer and 1%-5% aromatic oil, said stabilizer is made of TMTD accelerator It is configured with sulfur powder at a ratio of 2:1, and the SBS modifier can be thermoplastic styrene-butadiene rubber.
[0034] Its preparation method comprises the following steps:
[0035] Step 1: Transport 94.9% of the base asphalt to a high-temperature tank for heating to 178°C;
[0036] Step 2: Add base asphalt at a temperature of 178°C to the production tank, add 4% SBS modifier at the same time, and stir and mix for 2 hours;
[0037] Step 3, passing the stirred asphalt through a mill to fully dissolve it;
[0038] Step 4: Put the fully dissolved asphalt into the finished product tank, add 0.1% stabilizer and 1% aromatic oil into the finished product tank, stir and incubate for 2 hours again to obtain SBS modified asphalt.
Embodiment 3
[0040] A kind of SBS modified asphalt, including 91.8% of base asphalt, 5% of SBS modifier, 0.2% of stabilizer and 3% of aromatic oil, said stabilizer is made of TMTD accelerator and sulfur powder at a ratio of 2:1 The ratio is configured, and the SBS modifier can be thermoplastic styrene-butadiene rubber.
[0041] Its preparation method comprises the following steps:
[0042] Step 1, transport 91.8%% of the base asphalt to a high-temperature tank for heating, and heat it to 180°C;
[0043] Step 2: Add base asphalt at a temperature of 180°C to the production tank, add 5% SBS modifier at the same time, and stir and mix for 1.5 hours;
[0044] Step 3, passing the stirred asphalt through a mill to fully dissolve it;
[0045] Step 4: Put the fully dissolved asphalt into the finished product tank, add 0.2% stabilizer and 3% aromatic oil into the finished product tank, stir and mix again and incubate for 1.5 hours to obtain SBS modified asphalt.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com