A construction method and large-section technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as unreasonable division of areas, slow tunnel construction, hidden safety hazards, etc., achieve structural stability, speed up construction progress, and reduce investment Effect

Inactive Publication Date: 2016-08-24
THE FOURTH ENG CO LTD OF CTCE GRP
View PDF6 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the process of urban subway tunnel construction, in order to ensure the safety and construction speed of tunnel construction, sub-area and stepped excavation methods are generally adopted. In the prior art, the division of tunnel excavation areas is generally divided into horizontal and vertical sections from top to bottom. When excavating the steps in the direction, the area divided in the horizontal direction is excavated from top to bottom, excavated into steps from top to bottom, and pushed forward step by step. Although the construction of super-large cross-section tunnels in the prior art can Improve the excavation efficiency of the tunnel. However, the above-mentioned area division will appear unreasonable. The excavation sequence in the upper and lower directions will interfere with each other more often, resulting in the overall tunnel construction is still too slow, and in the case of mutual interference construction, there will be There are certain security risks

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of large-section tunnel
  • Construction method of large-section tunnel
  • Construction method of large-section tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] combine Figure 1 to Figure 3 , the present invention is further described:

[0029] A construction method for a large-section tunnel, characterized in that:

[0030] A. Divide the section of the tunnel 10 according to the upper, middle and lower directions and the left, middle and right directions into the upper left area 11, the middle left area 12, the lower left area 13, the upper middle area 14, the middle middle area 15, and the middle area. Lower area 16, upper right area 17, middle right area 18 and lower right area 19;

[0031] B, during the excavation construction of the above-mentioned 9 areas, first excavate the areas on the left and right sides of the tunnel 10, and carry out initial support to the areas on the left and right sides in time;

[0032] C. Excavate the middle area of ​​the tunnel 10, excavate the middle area of ​​the tunnel 10 from top to bottom, and carry out initial support for the left and right sides in time.

[0033] In the present inve...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of tunnel construction, in particular to a construction method of a large-section tunnel. The construction method comprises the following steps: zoning a section of a tunnel, wherein the section of the tunnel is zoned into a left upper zone, a left middle zone, a left lower zone, a middle upper zone, a middle middle zone, a middle lower zone, a right upper zone, a right middle zone and a right lower zone according to the upper-middle-lower direction and the left-middle-right direction; during excavation construction on the nine zones, firstly carrying out the excavation construction on zones at the left side and the right side of the tunnel, wherein the excavation construction is carried out on the zones at the left side and the right side of the tunnel from top to bottom, and primary support is carried out in time; then carrying out the excavation construction on the zones at the middle part of the tunnel, wherein the excavation construction is carried out on the zones at the middle part of the tunnel from top to bottom, and primary support is carried out in time. A closed loop is formed as section steel supporting frames are arranged around the outlines of all the zones, so that the structure of the tunnel is stable, safety construction can be ensured, the cost of temporary engineering is reduced, all zones can be subjected to synchronous construction, the operation of various machines is facilitated, the working efficiency is increased, the construction progress is quickened, and the construction of accessory structures such as an entrance / exit and an air duct is convenient.

Description

technical field [0001] The invention relates to the technical field of tunnel construction, in particular to a construction method for a large cross-section tunnel. Background technique [0002] In the process of urban subway tunnel construction, in order to ensure the safety and construction speed of tunnel construction, sub-regional and stepped excavation methods are generally adopted. In the prior art, the division of tunnel excavation areas is generally divided into horizontal and vertical sections from top to bottom. Steps in the direction, when excavating, the area divided in the horizontal direction is excavated from top to bottom, excavated into steps from top to bottom, and gradually pushed forward, although the construction of super-large cross-section tunnels in the prior art can be To improve the tunnel excavation efficiency, however, the above-mentioned area division will appear unreasonable, and the excavation sequence in the upper and lower directions will int...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/10
CPCE21D11/10
Inventor 刘文兵殷世刚潘彪罗彬黄景新袁景兵杨春峰刘刚
Owner THE FOURTH ENG CO LTD OF CTCE GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products