A technology of hydraulic support and welding method, which is applied in the direction of welding equipment, arc welding equipment, manufacturing tools, etc., can solve the problems of lower production efficiency, increase of manufacturing cost, and large welding stress, so as to achieve low production cost and solve large deformation , the effect of simple operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] like figure 1 As shown, a method for assembling and welding hydraulic support side guards, said hydraulic support side guards include side plates 4 and top plates 5, the method can be used for the top beam side guards and shield beam side guards in the hydraulic support frame , Tail beam side guard plate, etc. are assembled and welded. The method for assembling and welding the side guard of the hydraulic support includes the following steps: Step 1. Measure the width of the top plate 5, and determine the amount of reverse deformation according to the width B. In this embodiment, the width B of the top plate 5 is 220mm , The amount of anti-deformation A is 1.5mm, welding wire ER50-6 is used for welding, and the diameter of the welding wire is Φ1.2mm.
[0023] Step 2, the bottom of the top plate 5 is in contact with the side plate 4, and the top of the top plate 5 tilts to move the reverse deformation amount A.
[0024] Step 3. Weld the first weld seam 1 along the outer...
Embodiment 2
[0037] The main difference between this embodiment and Embodiment 1 is that: the width of the top plate is different, resulting in different welding parameters. In this embodiment, the width of the top plate is 350 mm, and the anti-deformation amount A is 4 mm. When welding, welding wire ER62-G is used, and the diameter of the welding wire is Φ1.2 mm, and then assembled and welded.
[0038] When welding the first weld seam, the welding current is 280A, the welding voltage is 30V, and the welding speed is 350mm / min; the welding of the bottom welding is completed.
[0039] When welding the second weld seam, the welding current is 300A, the welding voltage is 32V, and the welding speed is 380mm / min; the filling welding is completed.
[0040] When welding the third weld seam, the welding current is 300A, the welding voltage is 32V, and the welding speed is 380mm / min; the cover welding is completed.