Process and continuous production line for producing compound plates for water tanks
A production process and composite board technology, applied in the field of composite boards, can solve the problems of high cost of water tanks and high price of 304 stainless steel, and achieve the effects of low production cost, high peel strength and stable process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0030] Embodiment 2 of the present invention, such as figure 1 Shown:
[0031] A production process of a composite board for a water tank, comprising the following steps:
[0032] 1) Unwind the stainless steel plate 11 and the polymer film first, pre-laminate the polymer film and the stainless steel plate 11 on the preheating roller 3, and pre-melt the polymer film; the temperature of the preheating roller 3 is 180°C. The pre-melting time of the polymer film is 30 seconds, and the pre-melting temperature is 175°C.
[0033] 2) Unwind the galvanized sheet 12 and preheat it; the galvanized sheet 12 enters the heating furnace for preheating, the preheating time is 2.1 minutes, and the preheating temperature is 205°C.
[0034] 3) The two boards that have completed step 1) and step 2) are rolled and laminated. At least 4 sets of thermal lamination rollers are installed in the rolling lamination link, and multiple thermal rolls are performed. The polymer film is heated, Curing aft...
Embodiment 3
[0038] Embodiment 3 of the present invention, such as figure 1 Shown:
[0039] A production process of a composite board for a water tank, comprising the following steps:
[0040] 1) Unwind the stainless steel plate 11 and the polymer film first, pre-laminate the polymer film and the stainless steel plate 11 on the preheating roller 3, and pre-melt the polymer film; the temperature of the preheating roller 3 is 200°C. The pre-melting time of the polymer film is 40 seconds, and the pre-melting temperature is 195°C.
[0041] 2) Unwind the galvanized sheet 12 and preheat it; the galvanized sheet 12 enters the heating furnace 5 for preheating, the preheating time is 3 minutes, and the preheating temperature is 260°C.
[0042] 3) The two boards that have completed step 1) and step 2) are rolled and laminated. At least 4 sets of thermal lamination rollers are installed in the rolling lamination link, and multiple thermal rolls are performed. The polymer film is heated, Curing aft...