Steam flooding starting method for super-heavy oil horizontal wells
A technology for horizontal wells and ultra-heavy oil, applied in the field of steam flooding, can solve problems such as wellbore and reservoir damage, unfavorable effective exploitation of ultra-heavy oil reservoirs, etc., achieve high oil-steam ratio, avoid inter-well cracks, expand Effect of heating range
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0047] This embodiment provides a steam flooding start-up method for a super heavy oil horizontal well.
[0048] This embodiment takes a certain oil reservoir block in Xinjiang Oilfield as the research object. The oil reservoir is a shallow ultra-heavy oil reservoir with a burial depth of 160m, an average formation pressure of 1.5MPa, and a formation temperature of 18.0°C; m; porosity 32.2%, reservoir permeability 3097mD; average crude oil viscosity at 50°C 22000mPa·s; oil saturation 77.0%.
[0049] Deploying steam flooding horizontal well groups at the bottom of the reservoir can be done according to figure 1 The described well pattern structure is deployed, the production well 12 is deployed at the bottom of the super heavy oil reservoir, and the steam injection well 11 is deployed above the middle of two adjacent production wells. When deploying the well pattern, the number of horizontal wells can be according to It depends on the actual situation of the reservoir: for a r...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


