Construction method of steel plate pile cofferdam concrete sealed bottom
A technology of steel sheet pile cofferdam and construction method, which is applied in the direction of basic structure engineering, construction, etc., can solve problems such as engineering accidents, hidden dangers in the quality of back cover concrete, and easy inclusion of sediment, so as to speed up the construction progress, reduce the construction period, and the construction method simple effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] The construction method of the concrete back cover of the 115# pier of a Yellow River Highway Bridge:
[0031] (1) Foundation construction: According to the area of the steel sheet pile cofferdam, it is roughly divided into 20 areas according to 4.8*5.28m (such as figure 1 shown), the excavation point is set at the center of each partition, the mud pump is mainly used to absorb mud, and the underwater excavation of the long-arm excavator is supplemented. Mainly measure, supplemented by the method of underwater inspection for elevation detection, stop after meeting the design base elevation, and form the base;
[0032] (2) Cushion construction: Lay a gravel cushion with a thickness of about 20cm in the base;
[0033] (3) Back cover construction: Arrange the back cover conduits according to the partitions (such as figure 2 As shown), two groups of conduits are used for symmetrical concrete pouring construction. After pouring in the short side direction, it is moved t...
Embodiment 2
[0035] The construction method of the concrete back cover of the 109# pier of a Yellow River Highway Bridge:
[0036] (1) Foundation construction: According to the area of the steel sheet pile cofferdam, it is roughly divided into 20 areas according to 4.8*5.28m. The excavation point is set at the center of each area. The mud pump is mainly used to absorb mud. Excavation is supplemented by underwater excavation of the foundation pit in each area, and the measurement above the water surface is mainly used, supplemented by the method of underwater inspection for elevation detection, and stops after meeting the design base elevation to form the base;
[0037] (2) Cushion construction: Lay a gravel cushion with a thickness of about 15cm in the base;
[0038] (3) Back cover construction: Arrange the back cover conduits according to the partitions, use a single set of conduit concrete pouring construction, use the short side direction to pour and then move to the long side directi...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
| Slump | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 